Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Sp.67 Nctps Ii Es Circle Em Ii Division Esp S Dn Iii Complete Overhauling Alignment Checking Replacement Of Steel Wire Rope Cable Trolley Eot Cable Pendent With Cable And Load Testing Of Hoists 3 Ton Pertains To C Pass Of Esp I Hvr Transformers Loc
|
| Description |
Sp.67 Nctps Ii Es Circle Em Ii Division Esp S Dn Iii Complete Overhauling Alignment Checking Replacement Of Steel Wire Rope Cable Trolley Eot Cable Pendent With Cable And Load Testing Of Hoists 3 Ton Pertains To C Pass Of Esp I Hvr Transformers Loc
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_490488_1 |
|
Reference Number |
CE NCTPS II EM II SPEC NO 67 24 to 25 |
| Tender Fee | 0 |
| EMD | 3200 |
| Tender Value | - |
| Place | NCTPS II |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=582755 |
| Start Date | November 09, 2024 23:30 |
| End Date |
Expired
25/11/2024
Expired 685 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sp.63 nctps ii es circle em ii division esp sdn iii complete overhauling alignment checking replacement of steel wire rope and load testing of hoists 3ton 2nos pertains to esp ii in 600mw unit ii of nctps ii for a pass 1no and b pass 1no for
Sp.63 nctps ii es circle em ii division esp sdn iii complete overhauling alignment checking replacement of steel wire rope and load testing of hoists 3ton 2nos pertains to esp ii in 600mw unit ii of nctps ii for a pass 1no and b pass 1no for
Read moreSp.69 nctps ii es circle em ii dn esp sd iii complete overhauling alignment checking replacement of steel wire rope and load testing of hoists 3ton 2nos pertains to esp ii in 600mw unit ii of nctps ii for c pass 1no and d pass 1no for the shutd
Sp.69 nctps ii es circle em ii dn esp sd iii complete overhauling alignment checking replacement of steel wire rope and load testing of hoists 3ton 2nos pertains to esp ii in 600mw unit ii of nctps ii for c pass 1no and d pass 1no for the shutd
Read moreSp.54 nctps ii es circle em ii dn boiler aux sdn 1 complete overhauling including gear box and load testing of hoists 7.5ton 4 nos pertains to bcw pump cum motor 1a and 1c in 600mmw unit i of nctps ii front 2nos and rear 2 nos for the overhaul
Sp.54 nctps ii es circle em ii dn boiler aux sdn 1 complete overhauling including gear box and load testing of hoists 7.5ton 4 nos pertains to bcw pump cum motor 1a and 1c in 600mmw unit i of nctps ii front 2nos and rear 2 nos for the overhaul
Read moreNctps i es circle em i division s dn iii carrying out maintenance activities of hvr transformer cerm eerm motors removing the ash deposits and cleaning of esp hvr transformer floor area hvr transformer eerm 32 mts cerm motor 7 mtrs etc of u
Nctps i es circle em i division s dn iii carrying out maintenance activities of hvr transformer cerm eerm motors removing the ash deposits and cleaning of esp hvr transformer floor area hvr transformer eerm 32 mts cerm motor 7 mtrs etc of u
Read moreNctps i es circle em i dn esp sdn iii charges for healthiness checking and replacement of defective hopper heaters and replacement of the damaged hopper heater cable trays in unit ii during aoh 2025 26
Nctps i es circle em i dn esp sdn iii charges for healthiness checking and replacement of defective hopper heaters and replacement of the damaged hopper heater cable trays in unit ii during aoh 2025 26
Read moreNctps i es circle em i dn s dn iii carrying out maintenance activities of hvr transformer cerm eerm motors removing the ash deposits and cleaning of esp hvr transformer floor area hvr transformer eerm 32 mts cerm motors 7 mtrs etc of unit i i
Nctps i es circle em i dn s dn iii carrying out maintenance activities of hvr transformer cerm eerm motors removing the ash deposits and cleaning of esp hvr transformer floor area hvr transformer eerm 32 mts cerm motors 7 mtrs etc of unit i i
Read moreEs em-ii s.145 nctps ii es circle em ii dn sdn ii unit i esp overhauling and rectification of defective 100kva 373 v ac 75 kv dc m/s. bhel make hvr transformer in 2d1 location of unit i with sl.no.2024407.
Es em-ii s.145 nctps ii es circle em ii dn sdn ii unit i esp overhauling and rectification of defective 100kva 373 v ac 75 kv dc m/s. bhel make hvr transformer in 2d1 location of unit i with sl.no.2024407.
Read moreS.24 nctps ii es circle em ii division sdn iii carrying out running maintenance works in unit i and ii of esp for 360 days 2023-24.
S.24 nctps ii es circle em ii division sdn iii carrying out running maintenance works in unit i and ii of esp for 360 days 2023-24.
Read moreNctps i es circle em i dn sdn iii esp overhauling of lt rapping motors both cerm eerm in the esp area at unit i ii iii during the annual overhauling capital overhauling period of the year 2025 26
Nctps i es circle em i dn sdn iii esp overhauling of lt rapping motors both cerm eerm in the esp area at unit i ii iii during the annual overhauling capital overhauling period of the year 2025 26
Read moreSp.04 nctps ii es circle em ii division sub division iii rewinding of hv and lv coil of 2 nos. defective 100 kva hvr transformers released from 10c2 and 2d1 location of unit 1 esp.
Sp.04 nctps ii es circle em ii division sub division iii rewinding of hv and lv coil of 2 nos. &#x0d defective 100 kva hvr transformers released from 10c2 and 2d1 location of unit 1 esp.&#x0d
Read moreof your Industry type