Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Non Mettalic Fabric Expansion Bellow
|
| Description |
|
| Organisation | Department of Fertilizers | Ministry of Chemicals and Fertilizers |
| Tender Id | GEM/2025/B/5831240 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | January 17, 2025 22:26 |
| End Date |
Expired
27/01/2025
Expired 622 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
DEVNAM PIYADASSI BRIXWELL PRIVATE LIMITEDVinayak EnterprisesDD ENTERPRISESOFFICE...
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| Crompton Briz Air Deco 1200mm Lustre Brown | crompton | Crompton Briz Air Deco 1200mm Lustre Brown | 12 | ₹ 28800.000 |
| NOTICE BOARD | NA | NA | 4 | ₹ 4600.000 |
| Samsung MLT-D203S Black Toner Cartridge | SAMSUNG | Samsung MLT-D203S Black Toner Cartridge | 60 | ₹ 333600.000 |
| file cover with printing | AU | file cover with printing | 300 | ₹ 3000.000 |
| SIMMTRONICS 2GB | Simmtronics | SIMMTRONICS 2GB DDR2 | 14 | ₹ 14000.000 |
| File Tag Green | Unbranded | File Tag Green-v18 | 372 | ₹ 49848.000 |
| Microsoft Officestd 2016 SNGL OLP C | Microsoft | Microsoft & Officestd 2016 SNGL OLP C | 1 | ₹ 14800.000 |
| Electrical Wire 4mm Bundle 90M | finolex | 4m-CU-AL | 6 | ₹ 37800.000 |
| SURF EXCEL EASY WASH | surf excel | SURF EXCEL BLUE | 15 | ₹ 1638.750 |
| MULTIMEDIA PROJECTOR | Hitachi | HITACHI CP-X2542WN | 1 | ₹ 37280.000 |
| hp desktop | hp | HP Slimline 270-p020il | 2 | ₹ 64798.000 |
| GODREJ COMPUTER TABKE C11 | GODREJ INTERIO | GODREJ COMPUTER TABKE C11 | 2 | ₹ 17560.000 |
| CDMA Trainer | Tatame | Tatame TTCDMATR | 1 | ₹ 49990.000 |
| MEDICAL REIMBURSEMENT CLAIM FORM | PARAS | PARAS MEDICAL REIMBURSEMENT CLAIM FORM | 10 | ₹ 950.000 |
| best and more reliable weighing scale | Omron | hn289 omron | 25 | ₹ 49999.750 |
| Carrier split AC | Carrier | CAS18DF3N8F0/2018 | 1 | ₹ 37850.000 |
| File wrapper or flap | NA | wrapper | 600 | ₹ 2580.000 |
| file cabinet four drawer (NV) | N.V. | NV-FC-001 | 1 | ₹ 8900.100 |
| HP 204A Cyan LaserJet Toner Cartridge CF511A | hp | HP 204A Cyan LaserJet Toner Cartridge CF511A | 2 | ₹ 6986.000 |
| HP 204A Yellow LaserJet Toner Cartridge CF512A | hp | HP 204A Yellow LaserJet Toner Cartridge CF512A | 2 | ₹ 6986.000 |
Expansion of academic section 2 at 2nd floor of old opd block, nims
Expansion of academic section 2 at 2nd floor of old opd block, nims
Read moreDifferent sizes of rubber expansion joints (bellows) in water system of cam division of ktps-vi stage
Different sizes of rubber expansion joints (bellows) in water system of cam division of ktps-vi stage
Read moreExpansion and extra floor of community hall near rajalingam garden, ward no.4(under sdf scheme) (6th recall)
Expansion and extra floor of community hall near rajalingam garden, ward no.4(under sdf scheme) (6th recall)
Read moreProviding barbed wire fencing along the boundary of diverted forest land and boundary of srp oc-ii expansion project mine, srirampur area, mancherial dist., t.g.
Providing barbed wire fencing along the boundary of diverted forest land and boundary of srp oc-ii expansion project mine, srirampur area, mancherial dist., t.g.
Read moreProcurement of refrigerant non cfcri 34a air conditioner for use at srpocp srp area-reg.
Procurement of refrigerant non cfcri 34a air conditioner for use at srpocp srp area-reg.
Read moreComprehensive operation and maintenance and special repair of 110 nos ward level piped water supply schemes (non quality) & 16 nos pws scheme based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bill for five years. no. of schemes: wls(non quality): 110 pws(non quality): 16 p h division jhanjharpur
Comprehensive operation and maintenance and special repair of 110 nos ward level piped water supply schemes (non quality) & 16 nos pws scheme based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bill for five years. no. of schemes: wls(non quality): 110 pws(non quality): 16 p h division jhanjharpur
Read moreBmd-availing the services to carry out various non-destructive examinations (nde) in 1x500mw boiler during upcoming capital overhauls 2026-27
Bmd-availing the services to carry out various non-destructive examinations (nde) in 1x500mw boiler during upcoming capital overhauls 2026-27
Read moreProcurement of rear view mirror for non costcap shovels, 75t and 40t cranes and 12t cranes working at rgocp-iii, rg-ii area
Procurement of rear view mirror for non costcap shovels, 75t and 40t cranes and 12t cranes working at rgocp-iii, rg-ii area
Read moreQuotation rate for non sr item for installation of motors diesel general servicing and carrying out other necessary works in wet wells under vijayapura city corporation limits.
Quotation rate for non sr item for installation of motors diesel general servicing and carrying out other necessary works in wet wells under vijayapura city corporation limits.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreof your Industry type