Tender Details
Particulars | Details |
---|---|
Title |
Transmission Line Tower Package Tl02 For 220 K V S/C (On D/C Tower) Pang Upshi Line (Part 2)
|
Description |
Transmission Line Tower Package Tl02 For 220 K V S/C (On D/C Tower) Pang Upshi Line (Part 2) For 220k V Ac Transmission Line Between Pang And Phyang Associated With Transmission System For Evacuation Of Re Power From Renewable Energy Parks In Leh (5 Gw Leh Kaithal Transmission Corridor).
|
Organisation | Power Grid Corporation of India Limited | Central Govt. Ministry/Department |
Tender Id | 24570 |
Reference Number |
CC/NT/W-TW/DOM/A06/24/12013 |
Tender Fee | 25000 |
EMD | 0 |
Tender Value | |
Place | Multi Location |
Link | https://apps.powergrid.in/pgciltenders/u/view-published-tender-details.aspx?tid=9fbd00be-5317-4e3a-bde6-19f07db25b03 |
Start Date | August 31, 2024 04:30 |
End Date |
13/01/2025 ( Expired 98 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Allotment of land on long term lease of 10 years on as is where is basis in zone z- 2 plot 108 m2 0.03 acres in modern fish market area at fishing harbour area for installation of signal tower under commercial category
Allotment of land on long term lease of 10 years on as is where is basis in zone z- 2 plot 108 m2 0.03 acres in modern fish market area at fishing harbour area for installation of signal tower under commercial category
Read moreE-tender for repair of east side boundary wall of 220 kv s/stn. bbmb hisar
E-nit for repair of east side boundary wall of 220 kv s/stn. bbmb satroad hisar
 
Read moreExtension of switch house building at 220 kv s/s civil line amritsar.
Extension of switch house building at 220 kv s/s civil line amritsar.
Read moreDesign and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Read moreConstruction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Read moreTermination of the lilo of 220 kv sherpur jhajra at 120 mw vyasi hep ujvnl for direct at 400 kv substation sherpur pgcil with a line length of apx 2.5 km partially o h approx. 1.5 km with multi-circuit towers and partially with ug apx length 1 km
Termination of the lilo of 220 kv sherpur jhajra at 120 mw vyasi hep ujvnl for direct at 400 kv substation sherpur pgcil with a line length of apx 2.5 km partially o h approx. 1.5 km with multi-circuit towers and partially with ug apx length 1 km
Read moreJp/b933-037-pm-t-8010/1005 - cooling tower package for bina petchem and refinery expansion project(bprep), bina of m/s bharat petroleum corporation limited (bpcl)
Cooling tower package for bina petchem and refinery expansion project(bprep), bina of m/s bharat petroleum corporation limited (bpcl)
Read moreRetrofitting of 220 kv isolators for proposed 220 kv raghunathpur1 and 2 feeder under capex 24- 25 under emoph dept., stps, wbpdcl
Retrofitting of 220 kv isolators for proposed 220 kv raghunathpur1 and 2 feeder under capex 24- 25 under emoph&#x0d dept., stps, wbpdcl
Read moreEpcc package for linear low-density polyethylene (lldpe) / high density polyethylene (hdpe) swing unit (2 no s) (2x575 ktpa) of bina petrochemicals and refinery expansion project (bprep),madhya pradesh
Epcc package for linear low-density polyethylene (lldpe) / high density polyethylene (hdpe) swing unit (2 no s) (2x575 ktpa) of bina petrochemicals and refinery expansion project (bprep),madhya pradesh
Read moreStrengthening of earthing at various tower locations of 220 kv transmission line under 220kv oandm division chamba (tg)
Strengthening of earthing at various tower locations of 220 kv transmission line under 220kv oandm division chamba (tg)
Read moreof your Industry type