Tender Details
Particulars | Details |
---|---|
Title |
Camc Of 1.5 Tr Split,Camc Of 2 Tr Split Ac,Camc Of 1.5 Tr Window Ac,Camc Of 3 Tr Casette Ac,Camc Of
|
Description |
|
Organisation | NA | Ministry of Petroleum and Natural Gas |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | June 10, 2025 21:43 |
End Date |
21/06/2025 ( 7 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of automated on-line crude blending system for cdu 2 and 3 at mtf area - cpcl, manali.
Procurement of automated on-line crude blending system for cdu 2 and 3 at mtf area - cpcl, manali.
Read moreThree-year comprehensive annual maintenance contract (camc) for environmental control system (electrical, mechanical, water treatment plant and ro plant, excluding bms system) for 13 underground metro stations of l-2 and l-3 , and three-year..
Three-year comprehensive annual maintenance contract (camc) for environmental control system (electrical, mechanical, water treatment plant and ro plant, excluding bms system) for 13 underground metro stations of l-2 and l-3 , and three-year..
Read moreCustom bid for services - hiring of 13-3/8 inch whipstock with window milling services for a period
Read more
Replacement of ahu cooling coils installed at various underground metro stations of line 2, 3 and 6 in dmrc network.
Replacement of ahu cooling coils installed at various underground metro stations of line 2, 3 and 6 in dmrc network.
Read moreSuppy of intake service gate seals for unit no. 1, 2&3 at maithon hydel station dvc (84.606 meter)
Read more
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreConstruction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read more1.5 tr split ac,2.0 tr split ac,standard installation of 5 star rating inverter type 1.5_2.0 tr spl
Read more
Up-gradation of chiller plant manager (cpm) for three trane makes chillers (350 tr. each) installed at metro bhawan with 4 years camc of cpm including sensor after dlp period.
Up-gradation of chiller plant manager (cpm) for three trane makes chillers (350 tr. each) installed at metro bhawan with 4 years camc of cpm including sensor after dlp period.
Read moreRepair/maint of split acs, window acs, desert coolers, water coolers, refrigerator, deep freezer and allied e/m works at af stn suratgarh
Repair/maint of split acs, window acs, desert coolers, water coolers, 
 refrigerator, deep freezer and allied e/m works at af stn suratgarh
Read moreof your Industry type