Tender Details

Particulars Details
Title
Work Of Supply Of Armored Cable For Issuing New Connection Through Armored Cable Under Executive Engineer Electricity Distribution Division, Khalilabad And Mahdawal.
Description
Work Of Supply Of Armored Cable For Issuing New Connection Through Armored Cable Under Executive Engineer Electricity Distribution Division, Khalilabad And Mahdawal.
Organisation Government of Uttar Pradesh
Tender Id 2023_PVVNV_837695_1
Reference
Number
83/EDC(SKN)2023-24
Tender Fee 1180
EMD 8000
Tender Value
Place Sant Kabir Nagar
Link https://etender.up.nic.in
Start Date September 13, 2023 22:30
End Date

19/09/2023 ( Expired 650 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3

Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3

Read more
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa

Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa

Read more
Selection of bus operator for procurement, supply, operation and maintenance of 10,900 electric buses and development of allied electric and civil infrastructure on gross cost contracting (gcc) under pm e-drive scheme

Selection of bus operator for procurement, supply, operation and maintenance of 10,900 electric buses and development of allied electric and civil infrastructure on gross cost contracting (gcc) under pm e-drive scheme.

Read more
Design, engineering, manufacture, supply and delivery of new ip rotor (with full blading) for turbine model,c 210-130 (for 210 mw unit of kolaghat tps) through capex 2025-26

Design, engineering, manufacture, supply and delivery of new ip rotor (with full blading) for turbine model,c 210-130 (for 210 mw unit of kolaghat tps) through capex 2025-26

Read more
Work of making new tap connections under the water supply

Work of making new tap connections under the water supply

Read more
Hiring the services of one brand new mahindra scorpio base model bs vi or latest compliance having all assam and bengal permit for a period of 4 years under plp department, phq, guwahati.

Hiring the services of one brand new mahindra scorpio base model bs vi or latest compliance having all assam and bengal permit for a period of 4 years under plp department, phq, guwahati.

Read more
Providing tap connections to consumers, extension and augmentation of water supply system at ferozepur cantt. district ferozepur for distribution network under amrut 2.0 scheme

Providing tap connections to consumers, extension and augmentation of water supply system at ferozepur cantt. district ferozepur for distribution network under amrut 2.0 scheme

Read more
Biennial rate contract for pest control at all mcc room, cable vault, ht-lt switchgear room, plc room under emiph, emoph, ahp-em and chp-em of ktps

Biennial rate contract for pest control at all mcc room, cable vault, ht-lt switchgear room, plc room under emiph, emoph, ahp-em and chp-em of ktps

Read more
For the work of residual life assessment test of 40 mva transformer-i (gec alsthom make) at 220 kv substation sarh and 40 mva transformer -i (gec alsthom make) and 40 mva transformer -iii (alstom make) at 132kv substation krishna nagar under etd-ii,

For the work of residual life assessment test of 40 mva transformer-i (gec alsthom make) at 220 kv substation sarh and 40 mva transformer -i (gec alsthom make) and 40 mva transformer -iii (alstom make) at 132kv substation krishna nagar under etd-ii,

Read more
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise