Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of Ramp At Weigh Bridge At Wani Railway Siding Under Kp Ppg Sub Area Of Wani North Area.
|
| Description |
Repairing Of Ramp At Weigh Bridge At Wani Railway Siding Under Kp Ppg Sub Area Of Wani North Area.
|
| Organisation | Western Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_WCL_335726_1 |
|
Reference Number |
wn4650-civ- e038-2025-26 Date 19.05.2025 |
| Tender Fee | 0 |
| EMD | 5200 |
| Tender Value | - |
| Place | KP-PPG Sub Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=348028 |
| Start Date | May 20, 2025 15:30 |
| End Date |
Expired
30/05/2025
Expired 448 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Provision of approach road, pcc flooring and gate foundation for proposed automatic gate system at the entry point of coal rake between andal railway siding, west bengal to dstps, dvc plant siding.
Provision of approach road, pcc flooring and gate foundation for proposed automatic gate system at the entry point of coal rake between andal railway siding, west bengal to dstps, dvc plant siding.
Read moreAnnual rate contract for repairing of hand pump under city sub dn prod barmer
Annual rate contract for repairing of hand pump under city sub dn prod barmer
Read moreConstruction of samudayeek bhawan at chotki delha near new over bridge under g.m.c. ward no-02, gaya ji.
Construction of samudayeek bhawan at chotki delha near new over bridge under g.m.c. ward no-02, gaya ji.
Read moreUrgent preparatory work of new temporary langijoda high school located at dablin of bbsri ocp under bbsri area.
Urgent preparatory work of new temporary langijoda high school located at dablin of bbsri ocp under bbsri area.
Read moreComplete rewinding and repairing of pullen make 120 hp, 550v, 2900 rpm, 500 gpm submersible pump and motor for water supply at lohapatti colliery, mohuda group, wj area
Complete rewinding and repairing of pullen make 120 hp, 550v, 2900 rpm, 500 gpm submersible pump and motor for water supply at lohapatti colliery, mohuda group, wj area
Read moreCreation of 63 kva sub station along with ht/lt network at malik mohalla nagisheran bala and augmentation of 25 kva by 63 kva sub station shalidora astanpora under capex 2026-27
Creation of 63 kva sub station along with ht/lt network at malik mohalla nagisheran bala and augmentation of 25 kva by 63 kva sub station shalidora astanpora under capex 2026-27
Read moreRepair maintenance of external water supply pipe line pumpset and cleaning of borewell sump etc at zone a area under ge navy chennai
Repair maintenance of external water supply pipe line pumpset and cleaning of borewell sump etc at zone a area under ge navy chennai
Read moreCreation of 63 kva sub stations along with ht lt network at new colony alamgunj and challa mohalla bonpora d.k.pora under ut capex 2026
Creation of 63 kva sub stations along with ht lt network at new colony alamgunj and challa mohalla bonpora d.k.pora under ut capex 2026
Read moreConstruction of rcc. drain pcc. road from gaya high school (north east corner) to h/o-md. shakil and other lane at moh. new karimganj road no. under gnc. ward no. 26 gayaji.
Construction of rcc. drain pcc. road from gaya high school (north east corner) to h/o-md. shakil and other lane at moh. new karimganj road no. under gnc. ward no. 26 gayaji.
Read morePcc road construction from the motihari–areraj main road to the sub-divisional bar association in ward no. 03 under nagar panchayat areraj; pcc road and rcc drain construction from the sub-divisional bar association to the main road in front of the block-cum-circle office; and pcc road and rcc drain construction work from the main gate of the sub-divisional office via the environment office and block development officer's residence to the main road in front of the sdm residence, and from dr. k.k
Pcc road construction from the motihari–areraj main road to the sub-divisional bar association in ward no. 03 under nagar panchayat areraj; pcc road and rcc drain construction from the sub-divisional bar association to the main road in front of the block-cum-circle office; and pcc road and rcc drain construction work from the main gate of the sub-divisional office via the environment office and block development officer's residence to the main road in front of the sdm residence, and from dr. k.k. tiwari's residence to the north-east boundary of the park..
Read moreof your Industry type