Tender Details
Particulars | Details |
---|---|
Title |
Design, Development, Implementation And Maintenance Of Gigw Website For The Department Of Sahkari Samitiyan Evam Panchayat Lekha Parikhsha Uttar Pradesh
|
Description |
Design, Development, Implementation And Maintenance Of Gigw Website For The Department Of Sahkari Samitiyan Evam Panchayat Lekha Parikhsha Uttar Pradesh
|
Organisation | UPTRON Powertronics Limited | State Govt. and UT |
Tender Id | 2024_UPPOW_906649_1 |
Reference Number |
UPL/SW/2023-24/Feb/01 |
Tender Fee | 2360 |
EMD | 0 |
Tender Value | |
Place | Lucknow |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1563304 |
Start Date | February 29, 2024 21:30 |
End Date |
06/03/2024 ( Expired 446 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreDesign, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreDevelopment, operation and maintenance of wayside amenities 3 o -m sites in uttar pradesh and 1 o-m site in odisha (4 o-m sites)nh-27/kushinagar-harihar pur/up
Development, operation and maintenance of wayside amenities 3 o -m sites in uttar pradesh and 1 o-m site in odisha (4 o-m sites)nh-27/kushinagar-gopalganj/ 355-202/rhs/ harihar pur/uttar pradesh
Read moreDevelopment of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreLicensing of parking rights including design, development, operation and maintenance of smart parking solutions (payment through fastag / rfid / nfc / upi / ncmc / debit card / credit card / e-wallet etc) at (schedule-a) jhilmil metro station of..
Licensing of parking rights including design, development, operation and maintenance of smart parking solutions (payment through fastag / rfid / nfc / upi / ncmc / debit card / credit card / e-wallet etc) at (schedule-a) jhilmil metro station of..
Read moreHiring of consultancy firm for multi-purpose disaster shelter need assessment, development plan, shelter design and operational assistance in uttarakhand state under u-prepare project
Hiring of consultancy firm for multi-purpose disaster shelter need assessment, development plan, shelter design and operational assistance in uttarakhand state under u-prepare project
Read moreIndependent engineering services for operation and maintenance of churhat bypass section including tunnel on rewa-sidhi section of nh 75e from ch. 33.200 to ch. 55.400 design length 15.350 km. in the state of mp on hybrid annuity mode.
Independent engineering services for operation and maintenance of churhat bypass section including tunnel on rewa-sidhi section of nh 75e from ch. 33.200 to ch. 55.400 design length 15.350 km. in the state of mp on hybrid annuity mode.
Read moreSurvey, development, implementation, and maintenance of gis enabled mis system for ahmedabad city
Survey, development, implementation, and maintenance of gis enabled mis system for ahmedabad city
Read moreDesign, construction, supply, testing, commissioning of water treatment system with back wash water recycling system for improvement of the quality of water supplied to residential zone at haldia township under hdc including operation and maintenance
Design, construction, supply, testing, commissioning of water treatment system with back wash water recycling system for improvement of the quality of water supplied to residential zone at haldia township under hdc including operation and maintenance
Read moreof your Industry type