Tender Details

Particulars Details
Title
Strengthening And Modifications Of Sanquelim Branch Canal Of Left Bank Main Canal Of Tip Including Aqueduct And Other Appurtenances From Ch. 0.00 Km To 13.63 Km
Description
Strengthening And Modifications Of Sanquelim Branch Canal Of Left Bank Main Canal Of Tip Including Aqueduct And Other Appurtenances From Ch. 0.00 Km To 13.63 Km
Organisation Government of Goa
Tender Id 2023_WRD_12630_1
Reference
Number
WRD/WDVIII /PB/ F -6/11 /2023-24/TN-24
Tender Fee 30000
EMD 36.33 Lakh
Tender Value
Place Circle II WRD Karaswada Bardez
Link https://eprocure.goa.gov.in
Start Date December 26, 2023 18:30
End Date

15/01/2024 ( Expired 540 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders

Supplying and laying of 450 mm diameter ms rising main from&amp#x0d bank of india atm ruby park kasba branch to rathtala bus stand&amp#x0d kasba (j-8 to j-9)

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Consultancy services for rectification measures on mahadevpur to bhupalapally section 2lps of nh 353c from km 25.0 to 59.2 design ch. km.25.467 to 59.200 and dpr for parkal bypass, bhupalapally bypass on sironcha atmakur section of nh 353c

Consultancy services for rectification measures on mahadevpur to bhupalapally section 2lps of nh 353c from km 25.0 to 59.2 design ch. km.25.467 to 59.200 and dpr for parkal bypass, bhupalapally bypass on sironcha atmakur section of nh 353c

Read more
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(

Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(

Read more
Reconstruction of reengus rob destressed re wall lhs and strengthening of existing reengus rob rhs in jaipur-reengus sikar section of nh 52 from km 296.200 to 297.350 (total length 1150m) in the state of rajasthan on item rate (percentage) basis

Reconstruction of reengus rob destressed re wall lhs and strengthening of existing reengus rob rhs in jaipur-reengus sikar section of nh 52 from km 296.200 to 297.350 (total length 1150m) in the state of rajasthan on item rate (percentage) basis

Read more
Performance based maintenance contract (pbmc) of nh-05 from km 0.00 at crossing sector 34-35 to u.t. boundary km 6.415 and km 0.00 at crossing sector 34-35 to km 8.30 u.t. boundary zirakpur including service lanes except km 3.18 to km 4.83 u.t.

Performance based maintenance contract (pbmc) of nh-05 from km 0.00 at crossing sector 34-35 to u.t. boundary km 6.415 and km 0.00 at crossing sector 34-35 to km 8.30 u.t. boundary zirakpur including service lanes except km 3.18 to km 4.83 u.t

Read more
Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor

Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor

Read more
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450

Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450

Read more
Strengthening from km 0.00 to 13.200 ( majhola to khatima) on nh-731k on epc mode under annual plan 2024-25 in the state of uttarkhand

Strengthening from km 0.00 to 13.200 ( majhola to khatima) on nh-731k on epc mode under annual plan 2024-25 in the state of uttarkhand

Read more
Rehabilitation and up-gradation from design ch km 35.300 to km 65.740 (length-30.440km) of nh-166g (gaganbawada to kale) to 2lps in the state of maharashtra on epc mode.

Rehabilitation and up-gradation from design ch km 35.300 to km 65.740 (length-30.440km) of nh-166g (gaganbawada to kale) to 2lps in the state of maharashtra on epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise