Tender Details
Particulars | Details |
---|---|
Title |
Restoration Of Roadcut Made By Cmwssb For Enlargement Of Pumping Main And Allied Work At Anna Main Road From Nakeeran Street Junction To Nesapakkam Stp In Div 137 And 138 Zone 10
|
Description |
Restoration Of Roadcut Made By Cmwssb For Enlargement Of Pumping Main And Allied Work At Anna Main Road From Nakeeran Street Junction To Nesapakkam Stp In Div 137 And 138 Zone 10
|
Organisation | Corporation of Chennai | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 28000 |
Tender Value | |
Place | CHENNAI |
Link |
AAAAAAAAAA Login to view |
Start Date | May 26, 2025 23:30 |
End Date |
02/06/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
2- construction work of cc road and drain from kiratpur bijnor main road to banjaro wla kabristan in block-kiratpur.
2- construction work of cc road and drain from kiratpur bijnor main road to banjaro wla kabristan in block-kiratpur.
Read moreAAAAAAAAAA
Login to viewRestoration work due to cutting of 850m open trench by kmda for laying of under ground 110m dia hdpe main distribution pipe line under amrut 2.0 in naihati from 6.45km to 7.35km of g p rd at shoulder and mastic surface under bkp divn during 25-26
Read moreLaying of paver block and cement concrete work both side of road on removed encroachment place from 60 feet road palhar nagar to ambikapuri in ward no. 14 under zone no. 16
Laying of paver block and cement concrete work both side of road on removed encroachment place from 60 feet road palhar nagar to ambikapuri in ward no. 14 under zone no. 16
Read moreEl.d.c.no.centre/1934/2025/ supply and erection of 10 nos of 9.5 mtr lamp post with led fittings at mandapam road play ground in div 101, zone 8
El.d.c.no.centre/1934/2025/ supply and erection of 10 nos of 9.5 mtr lamp post with led fittings at mandapam road play ground in div 101, zone 8
Read moreEl.d.c.no.north/1440/2025/ painting and numbering of 567 nos of street lamp posts at palpannai road, gnt road and various locations in div 25,27,28,30,32 and 33, zone 3
El.d.c.no.north/1440/2025/ painting and numbering of 567 nos of street lamp posts at palpannai road, gnt road and various locations in div 25,27,28,30,32 and 33, zone 3
Read moreLaying of 450mm dia np3 pipe line and cc road restoration from h.no.18-7-423/a277 to 18-7-423/a/278 and bylanes in aman nagar-b talabkatta yakutpura assembly constituency, hyderabad proposed by sri mirza riyaz ui hassan effendi, honble mlc under cdp- 2023-24
Laying of 450mm dia np3 pipe line and cc road restoration from h.no.18-7-423/a277 to 18-7-423/a/278 and bylanes in aman nagar-b talabkatta yakutpura assembly constituency, hyderabad proposed by sri mirza riyaz ui hassan effendi, hon ble mlc under cdp- 2023-24
Read moreLaying of 300mm dia swg pipe line and cc road restoration from h.no.18-7-299/164 to h.no.18-7-299/136 in aman nagar-b talabkatta yakutpura assembly constituency, hyderabad proposed by sri mirza riyaz ui hassan effendi, honble mlc under cdp- 2023-24
Laying of 300mm dia swg pipe line and cc road restoration from h.no.18-7-299/164 to h.no.18-7-299/136 in aman nagar-b talabkatta yakutpura assembly constituency, hyderabad proposed by sri mirza riyaz ui hassan effendi, hon ble mlc under cdp- 2023-24
Read moreReeling and drain repair work using cc interlocking tiles from anils house to nunhus house on the main road of gayatri nagar colony in ward 19, kanjadaspur.
Reeling and drain repair work using cc interlocking tiles from anils house to nunhus house on the main road of gayatri nagar colony in ward 19, kanjadaspur.&#x0d
Read moreLaying of paver block and cement concrete work on road from power house gate to bholaram niwas road in ward no. 57 under zone no. 03 (mahapor nidhi)
Laying of paver block and cement concrete work on road from power house gate to bholaram niwas road in ward no. 57 under zone no. 03 (mahapor nidhi)
Read moreDeposit wss to kondotty interconnection work from existing line and newly laid 160 mm hdpe along nh966 thalekkara to pothuvettippara and commissioning of existing distribution system and road restoration work in lsgd roads in kondotty
Deposit wss to kondotty interconnection work from existing line and newly laid 160 mm hdpe along nh966 thalekkara to pothuvettippara and commissioning of existing distribution system and road restoration work in lsgd roads in kondotty
Read moreof your Industry type