Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling 15mtr Rtt At Kallekkad Including Transportation Providing Rcc Base For Tower Erection Painting Earthing At Cto Building Palakkad
|
| Description |
Dismantling 15mtr Rtt At Kallekkad Including Transportation Providing Rcc Base For Tower Erection Painting Earthing At Cto Building Palakkad
|
| Organisation | Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings |
| Tender Id | 2025_BSNL_234216_1 |
|
Reference Number |
06/EE/BSNL/TCR/2025-26 |
| Tender Fee | 590 |
| EMD | 18139 |
| Tender Value | - |
| Place | Palakkad |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=265339 |
| Start Date | May 01, 2025 23:30 |
| End Date |
Expired
06/05/2025
Expired 529 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling, fabrication and erection of prill tower ring platform
Dismantling, fabrication and erection of prill tower ring platform
Read moreDismantling, shifting and erection of 20 nos high mast lighting tower
Dismantling, shifting and erection of 20 nos high mast lighting tower (20/30 mtrs height) in different location as per requirement of mines under kusmunda open cast project
Read moreDismantling, shifting, re-erection, foundation, electrical cable shifting/extension, earthing, testing and commissioning of street light pole.
Dismantling, shifting, re-erection, foundation, electrical cable shifting/extension, earthing, testing and commissioning of street light pole.
Read moreDismantling, transportation, design and construction of foundation, erection of 45 m high self-supporting lattice steel tower at akashvani mahabubnagar as per specification
Dismantling, transportation, design and construction of foundation, erection of 45 m high self-supporting lattice steel tower at akashvani mahabubnagar as per specification
Read moreDismantling of ascr panther conductor from dead end gantry to tower no. 05 of kachhwa-ii line, construction of 01no. c 0 type tower, erection and stringing of htls panther conductor
Dismantling of ascr panther conductor from dead end gantry to tower no. 05 of kachhwa-ii line, construction of 01no. c 0 type tower, erection and stringing of htls panther conductor
Read moreCustom bid for services - rehabilitation of 220kv double circuit a type tower at loc no 80 of l 201 202 ctps rtps by dismantling of bent tower and erection of one similar tower at same loc using existing stub including transportation of tower materia..
Custom bid for services - rehabilitation of 220kv double circuit a type tower at loc no 80 of l 201 202 ctps rtps by dismantling of bent tower and erection of one similar tower at same loc using existing stub including transportation of tower materia..
Read moreProviding lightning arrestor, earthing ,cradle guard and erection of poles, etc and dismantling of poles, conductor,etc near mahalaxmi camp sub station and its 3.3kv ht line under ashok west ocp, piparwar area.
Providing lightning arrestor, earthing ,cradle guard and erection of poles, etc and dismantling of poles, conductor,etc near mahalaxmi camp sub station and its 3.3kv ht line under ashok west ocp, piparwar area.
Read moreDismantling, re-erection, and construction of 132 kv dc lilo of rongkhon ampati due to diversion of the 132 kv dc lilo of rongkhon ampati at the 132/33 kv praharinagar substation (between tower locations 8 and 12) (line length 1.85 ckm)
Dismantling, re-erection, and construction of 132 kv dc lilo of rongkhon ampati due to diversion of the 132 kv dc lilo of rongkhon ampati at the 132/33 kv praharinagar substation (between tower locations 8 and 12) (line length 1.85 ckm)
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreof your Industry type