Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
200 Mw Ists Connected Wind Power Project On Pan India Basis With O&M For 10 Years
|
| Description |
200 Mw Ists Connected Wind Power Project On Pan India Basis With O&M For 10 Years
|
| Organisation | Neyveli Lignite Corporation Limited | Public Sector Undertakings |
| Tender Id | 2526000136 |
|
Reference Number |
2526000136 |
| Tender Fee | 20000 |
| EMD | 9.32 Crore |
| Tender Value | - |
| Place | Neyveli |
| Link |
View Original Tender Notice
https://procure.nlcindia.in/specification/tender/2526000136 |
| Start Date | September 03, 2025 03:30 |
| End Date |
Expired
07/10/2025
Expired 370 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.
Design, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.
Read moreTender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl
Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl
Read moreBmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Read moreRfs for 500 mw ists-connected wind power projects in india (seci-tranche-xvii)
Rfs for 500 mw ists-connected wind power projects in india (seci-tranche-xvii)
Read moreRfs for 1350 mw ists-connected wind power projects in india (seci-tranche-xvi)
Rfs for 1350 mw ists-connected wind power projects in india (seci-tranche-xvi)
Read moreRfs setting up of 1200 mw ists-connected wind-solar hybrid power projects (seci-tranche-viii)
Rfs setting up of 1200 mw ists-connected wind-solar hybrid power projects (seci-tranche-viii)
Read moreRfs for setting up of 500 mw ists-connected offshore wind power project in india (tranche-i)
Rfs for setting up of 500 mw ists-connected offshore wind power project in india (tranche-i)
Read moreRfs for setting up of 400 mw ists-connected wind-solar hybrid power projects (seci-tranche-ix)
Rfs for setting up of 400 mw ists-connected wind-solar hybrid power projects (seci-tranche-ix)
Read moreRfs for setting up of 400 mw ists-connected wind power projects in india (seci-tranche-xviii)
Rfs for setting up of 400 mw ists-connected wind power projects in india (seci-tranche-xviii)
Read moreSetting up of 100 mw ists connected solar power project on pan india basis with operation & maintena
Setting up of 100 mw ists connected solar power project on pan india basis with operation & maintena
Read moreof your Industry type