Tender Details

Particulars Details
Title
Providing Security & Allied Services For Depot, Stations, Viaduct, Tunnel, Track And Trains In Reach 3&3 A And Underground Sections (Ug1&Ug2) Of Bmrcl
Description
Providing Security & Allied Services For Depot, Stations, Viaduct, Tunnel, Track And Trains In Reach 3&3 A And Underground Sections (Ug1&Ug2) Of Bmrcl
Organisation Bangalore Metro Rail Corporation Limited
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD -
Tender Value 89.42 Crore
Place Karnataka
Link Login to view
Start Date August 25, 2026 16:43
End Date
Open 26/09/2026

5 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Providing security & allied services for stations, viaduct, track and trains in phase-2a sections of bmrcl

Providing security & allied services for stations, viaduct, track and trains in phase-2a sections of bmrcl

Read more
Providing maintenance services for telecommunication systems at phase-1 stations, adbuilding, occ, viaduct, tunnel, depot and other related premises/stages of cmrl including trains.

Providing maintenance services for telecommunication systems at phase-1 stations, adbuilding, occ, viaduct, tunnel, depot and other related premises/stages of cmrl including trains.

Read more
Maintenance contract for controlling leakage and seepage in underground section including tunnel/viaduct, station building, ancillary building, rss and maintenance of drainage system of viaduct of line - 7 from durgabai deshmukh south campus..

Maintenance contract for controlling leakage and seepage in underground section including tunnel/viaduct, station building, ancillary building, rss and maintenance of drainage system of viaduct of line - 7 from durgabai deshmukh south campus..

Read more
Maintenance contract for controlling leakage and seepage in underground section including tunnel/viaduct, station building, ancillary building, staff quarters, depot, rss and maintenance of drainage system of viaduct of line-7 from majlis park to...

Maintenance contract for controlling leakage and seepage in underground section including tunnel/viaduct, station building, ancillary building, staff quarters, depot, rss and maintenance of drainage system of viaduct of line-7 from majlis park to...

Read more
Providing maintenance services for signalling and train control systems at stations adbuilding occ viaduct tunnel trains depots and other related premises of cmrlcorridor 1 and corridor 2.

Providing maintenance services for signalling and train control&#x0d systems at stations adbuilding occ viaduct tunnel trains depots and&#x0d other related premises of cmrl corridor 1 and corridor 2.

Read more
Design, supply, installation, testing and commissioning of ballastless track for elevated viaduct of reach 1b and reach 3a of nmrp ph-2 incl supply of 1080 grade hh rails, track fastenings, 1 in 9 r300 ballastless turnouts and other misc works.

Design, supply, installation, testing and commissioning of ballastless track for elevated viaduct of reach 1b and reach 3a of nmrp ph-2 incl supply of 1080 grade hh rails, track fastenings, 1 in 9 r300 ballastless turnouts and other misc works.

Read more
Maintenance contract for controlling leakage and seepage in underground/elevated section including tunnel, stations, ancillary buildings, viaduct and depot etc. of line-8 from botanical garden to krishna park extension and line-8 extension stations.

Maintenance contract for controlling leakage and seepage in underground/elevated section including tunnel, stations, ancillary buildings, viaduct and depot etc. of line-8 from botanical garden to krishna park extension and line-8 extension stations.

Read more
Design and construction of elevated metro viaduct for nmrp phase-2 in: i.between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii.between ch: 18218.586 m to ch: 24633.194 m of length 6.414 km in reach-3a iii.between ch: (-) 289.668 m to ch: (-) 5622.577 m of length 5.333 km in reach-4a

Design and construction of elevated metro viaduct for nmrp phase-2 in: i.between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii.between ch: 18218.586 m to ch: 24633.194 m of length 6.414 km in reach-3a iii.between ch: (-) 289.668 m to ch: (-) 5622.577 m of length 5.333 km in reach-4a

Read more
Design and construction of elevated metro viaduct for nmrp phase-2 in i. between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii. between ch 18218.586 m to ch 24633.194 m of length 6.414 km in reach 3a iii. between ch (-) 289.

Design and construction of elevated metro viaduct for nmrp phase-2 in i. between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii. between ch 18218.586 m to ch 24633.194 m of length 6.414 km in reach 3a iii. between ch (-) 289.

Read more
Campus develoment of iit hyderabad providing and laying of 150mm dia canvas hose pipe 2613 meters at the new hostel to remove accumulated water in the underground hvac tunnel of packages 3a and 3b works at iit hyderabad

Campus develoment of iit hyderabad providing and laying of 150mm dia canvas hose pipe 2613 meters at the new hostel to remove accumulated water in the underground hvac tunnel of packages 3a and 3b works at iit hyderabadcampus develoment of iit hyd

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise