Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair Work For S.K To Hirni Kheda Road Damage Portion Deposite Work Under P.W.D Sub Division Sheopur( Third Call )
|
| Description |
Repair Work For S.K To Hirni Kheda Road Damage Portion Deposite Work Under P.W.D Sub Division Sheopur( Third Call )
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_PWDRB_284412_1 |
|
Reference Number |
37/TC/2023-24/Sheopur |
| Tender Fee | 2000 |
| EMD | 6440 |
| Tender Value | - |
| Place | EE PWD |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | June 20, 2023 20:05 |
| End Date |
Expired
03/07/2023
Expired 1202 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Emergent patch repairing work to the damage portion occurred due to heavy rainfall of rangpur diversion_sl. 3
Emergent patch repairing work to the damage portion occurred due to heavy rainfall of rangpur diversion_sl. 3
Read moreThird party techno financial audit for the work of construction of 80 feet wide road by providing and laying unreinforced plain cement concrete pavement m 35 on metalled portion and service road in sector 39a, samrala road, ludhiana.
Third party techno financial audit for the work of construction of 80 feet wide road by providing and laying unreinforced plain cement concrete pavement m 35 on metalled portion and service road in sector 39a, samrala road, ludhiana.
Read moreRepairing straightening welding clamping for 440 volt overhead line pipe pole damage for base portion at different locations of 3 pit substation to pandebera basti fatehpur basti mohriband basti staff quarter kujama section of amal. nt-st-kujama coll
Repairing straightening welding clamping for 440 volt overhead line pipe pole damage for base portion at different locations of 3 pit substation to pandebera basti fatehpur basti mohriband basti staff quarter kujama section of amal. nt-st-kujama coll
Read moreBattery box assembly schedule of infrastructural requirements for stainless steel battery box complete as per specfication no: mdst 141 rev.01 , as per drawing: cc91205 alt a , packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any shall be at the cost of supplier.
Battery box assembly schedule of infrastructural requirements for stainless steel battery box complete as per specfication no: mdst 141 rev.01 , as per drawing: cc91205 alt a , packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any shall be at the cost of supplier.
Read moreTrough floor assembly complete for 3 phase memu/dmc coach note:- 1.0 extra channels are to be provided on suitable location of trough floor assembly for lifting/transporation purpose ., as per drawing: em11545 alt b item no. 6 to be supplied as loose in seprate packing, packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any sh
Trough floor assembly complete for 3 phase memu/dmc coach note:- 1.0 extra channels are to be provided on suitable location of trough floor assembly for lifting/transporation purpose ., as per drawing: em11545 alt b item no. 6 to be supplied as loose in seprate packing, packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any sh
Read moreRepair work for s.k to hirni kheda road damage portion deposite work under p.w.d sub-division sheopur( fourth call )
Repair work for s.k to hirni kheda road damage portion deposite work under p.w.d sub-division sheopur( fourth call )
Read moreB.t. batch repair hirnikheda to gurnavada road length 4.80 k.m. under p.g. p.w.d sub-division sheopur(third call)
B.t. batch repair hirnikheda to gurnavada road length 4.80 k.m. under p.g. p.w.d sub-division sheopur(third call)
Read moreMaintenance and repair work of district court sheopur under p.w.d. sub division sheopur
Maintenance and repair work of district court sheopur under p.w.d. sub division sheopur
Read moreS.r./m.o.w. work of n.r.b. under p.w.d. sub dn. multai. (deposite work)
S.r./m.o.w. work of n.r.b. under p.w.d. sub dn. multai. (deposite work)
Read moreS.r./a.r./m.o.w. work of n.r.b. (rst house, court, p.w.d. office and building) under p.w.d. sub dn. betul. (deposite work)
S.r./a.r./m.o.w. work of n.r.b. (rst house, court, p.w.d. office and building) under p.w.d. sub dn. betul. (deposite work)
Read moreof your Industry type