Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
70 Watt Led Street Light Fitting
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106586803 |
|
Reference Number |
86255090 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Mumbai |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/022025/106586803/viewNitPdf_4842605.pdf |
| Start Date | January 22, 2025 21:47 |
| End Date |
Expired
18/02/2025
Expired 600 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of flp well glass fitting with led lamp for use at alp mine
Procurement of flp well glass fitting with led lamp for use at alp mine
Read moreSupplying and fixing of 120 watt led lights at various places in div no 1-66 of mck-2026 est. cost of rs. 16.40 lakhs under mgf
Supplying and fixing of 120 watt led lights at various places in div no 1-66 of mck-2026 est. cost of rs. 16.40 lakhs under mgf
Read moreLaying of cc patches from arr residency to h.no -2-4-70/173 and 174 p in road no:-09 in ward -113 hyderguda div in attapur circle-20,rjnrz, ghmc. (rs. 7.25 lakhs)
Laying of cc patches from arr residency to h.no -2-4-70/173 and 174 p in road no:-09 in ward -113 hyderguda div in attapur circle-20,rjnrz, ghmc. (rs. 7.25 lakhs)
Read moreSupply, fitting and fixing offurniture, false ceiling, wall paneling, interactive flat panel, wired conference system, conference table etc. for meeting hall at jai prakash university, chapra, saranfor the year 2026-27
Supply, fitting and fixing offurniture, false ceiling, wall paneling, interactive flat panel, wired conference system, conference table etc. for meeting hall at jai prakash university, chapra, saranfor the year 2026-27
Read moreProviding of temporary lighting (70 nos. of 120w led flood lights) for 1 days (12-10-2026) at talabkatta, nasheman nagar in talab chanchalam division (79) in yakuthpura circle-26 and constituency in view of milad-un-nabi celebrations
Providing of temporary lighting (70 nos. of 120w led flood lights) for 1 days (12-10-2026) at talabkatta, nasheman nagar in talab chanchalam division (79) in yakuthpura circle-26 and constituency in view of milad-un-nabi celebrations
Read moreConstruction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for gaya-rajauli road (sh-70): 6-lane (3-lane on each side) at one location in the state of bihar.
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for gaya-rajauli road (sh-70): 6-lane (3-lane on each side) at one location in the state of bihar.
Read moreGr no-01 comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-10 schemes), ii.) ward level piped water supply schemes in quality affected wards (wls_quality-70 schemes) and iii.) ward level piped water supply schemes in non quality affected wards(wls_non quality-359 schemes) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
Gr no-01 comprehensive operation and maintenance, routine repairs and special repairs of i.) rural piped water supply scheme (pws-10 schemes), ii.) ward level piped water supply schemes in quality affected wards (wls_quality-70 schemes) and iii.) ward level piped water supply schemes in non quality affected wards(wls_non quality-359 schemes) based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bills for five years.
Read moreof your Industry type