Tender Details

Particulars Details
Title
Dismantling Of Overhead Line Poles, Brackets, Top Clamps, Etc. Due To Extension, Di Of Overhead Line At Barkutta Ob Face, Narayani Face, Cat Face And Pumping Face Of Mines Of Kocp For A Period Of 365 Days.
Description
Dismantling Of Overhead Line Poles, Brackets, Top Clamps, Etc. Due To Extension, Di Of Overhead Line At Barkutta Ob Face, Narayani Face, Cat Face And Pumping Face Of Mines Of Kocp For A Period Of 365 Days.
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_SECL_300934_1
Reference
Number
SECL/GM/KSM/EnM/ eTender/23-24/65
Tender Fee 0
EMD 63200
Tender Value
Place KUSMUNDA OPEN CAST PROJECT
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=311759
Start Date February 12, 2024 16:30
End Date

01/03/2024 ( Expired 473 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
(a) di of 6.6kv o/h line due to advancement of 0b face and ob dump (b) changing of tilted 11kv poles and tensioning of conductor at mathaband under muraidih (c) di of 3.3kv o/h line due to damage by dumper at jarlahi, amp colliery.

(a) di of 6.6kv o/h line due to advancement of 0b face and ob dump (b) changing of tilted 11kv poles and tensioning of conductor at mathaband under muraidih (c) di of 3.3kv o/h line due to damage by dumper at jarlahi, amp colliery.

Read more
Amc for erection/ dismantle of poles, oh materials etc for re-arrangement and extension of 3.3kv oh lines due to advancement of ob and coal face in mine under rohini project, nk area

Amc for erection/ dismantle of poles, oh materials etc for re-arrangement and extension of 3.3kv oh lines due to advancement of ob and coal face in mine under rohini project, nk area

Read more
Day to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .

Day to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .

Read more
Day to day erection ,dismantling and di of 3.3 kv overhead lines in various parts of mines at lajkura ocp,ib valley area for a period of 2 years

Day to day erection ,dismantling and di of 3.3 kv overhead lines in various parts of mines at lajkura ocp,ib valley area for a period of 2 years

Read more
Erection of lighting overhead line from chandni chowk to khodri ob face and ncc chowk to godavari face for proper illumination in the mines at kocp

Erection of lighting overhead line from chandni chowk to khodri ob face and ncc chowk to godavari face for proper illumination in the mines at kocp.

Read more
Di /extension and dismantling of 6.6 kv power line of western part on as and when required basis for quarry section at gevra project for a period of 365 days

Di /extension and dismantling of 6.6 kv power line of western part on as and when required basis for quarry section at gevra project for a period of 365 days

Read more
Extension/ erection of lt overhead line (approx. route length for erection/ extension is 1200m and n dismantling of lt line (approx. route length for dismantling is 600 mtr) for a period of six months (180 days) on as when and where required basis

Extension/ erection of lt overhead line (approx. route length for erection/ extension is 1200m and n dismantling of lt line (approx. route length for dismantling is 600 mtr) for a period of six months (180 days) on as when and where required basis

Read more
Work of di/extension and dismantling of lt overhead line of eastern part i.e. bramhaputra, 223, bahanpat, bhatora patch, naraibodh patch of mines on as and when required basis for quarry at gevra project for a period of 365 days.

Work of di/extension and dismantling of lt overhead line of eastern part i.e. bramhaputra, 223, bahanpat, bhatora patch, naraibodh patch of mines on as and when required basis for quarry at gevra project for a period of 365 days.

Read more
Day to day shifting , reorganizing , dismantling and erection of lt overhead line for a period of 01 year (365 days) at baroud ocm, secl raigarh area.

Day to day shifting , reorganizing , dismantling and erection of lt overhead line for a period of 01 year (365 days) at baroud ocm, secl raigarh area.

Read more
Job1. day to day oh line work such as erection dismantling shifting and branch di of lt overhead lines at voltage 220v/440v on as and when required basis for period of 01 year at different section of mines at ashok ocp under piparwar area.

Job1. day to day oh line work such as erection dismantling shifting and branch di of lt overhead lines at voltage 220v/440v on as and when required basis for period of 01 year at different section of mines at ashok ocp under piparwar area.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise