Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
๐ Invitation For Bids: Construction Of Hhp Loco Shed ๐๏ธ๐ The Ministry Of Railways, Central Government, Invites Bids From Reputable Construction Firms For The Construction Of A High Horse Power (Hhp) Loco Shed At Hazipur. ๐ ๏ธ ๐ Bid Submission Deadline: July 15, 2024, 12:00 Pm The Tender Fee Is Non Refundable Inr 209,300. Interested Bidders Must Review The Complete Tender Document For Detailed Specifications, Project Scope, And Submission Guidelines. Keywords: Construction, Hhp Loco Shed, Ministry Of Railways, Electric Locomotive, Government Tender, Hazipur, India| Particulars | Details |
|---|---|
| Title |
Construction Of Hhp Loco Shed To Home/Maintain Electric Loco/3 Phase Locomotive.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 75795779 |
|
Reference Number |
TRD-SEE-GS-24-25-2 |
| Tender Fee | 0 |
| EMD | 2.09 Lakh |
| Tender Value | |
| Place | Hazipur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75795779/viewNitPdf_4612860.pdf |
| Start Date | June 22, 2024 00:02 |
| End Date |
Expired
15/07/2024
Expired 738 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreRepair/reconditioning of 6531 kva transformer for 3-phase electric locomotive i.e.wag9 of electric loco shed, bilaspur.
For complete deion and other details, please refer to tender
Read morePu (polyurethane) painting to earlier p.u. painted 3 phase electric locomotive at electric loco shed, bhilai for 2 year
For complete deion and other details, please refer to tender
Read moreMaster controller for 3-phase electric loco
For complete deion and other details, please refer to tender
Read moreAmc of cab ac mounted on roof of 3-phase (wag-9) electric locomotive of electric loco shed/ddu. (qty=18 loco=36 unit of cab ac) for three years.
For complete deion and other details, please refer to tender
Read moreof your Industry type