Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Information Centre,Ticket Counterand Ecoshop In Nagaravanam At Edavetty Area In Thodupuzha Range Under Kothamangalam
|
| Description |
Earthwork Cement Concrete Soildblockmasonry Steelwork Sheetworktilework Woodwork Painting
|
| Organisation | Government of Kerala |
| Tender Id | 2023_FD_622935_1 |
|
Reference Number |
A1PFM-26893 |
| Tender Fee | 1200 |
| EMD | 12000 |
| Tender Value | |
| Place | Divisional Forest office Kothamangalam |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | November 17, 2023 22:30 |
| End Date |
Expired
25/11/2023
Expired 970 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of drainage at mgr nagar in narasingarayanpettai
Construction of drainage at mgr nagar in narasingarayanpettai
Read moreUnder district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstructing children park in edavetty nagaravanam project area under thodupuzha range during 2025-26
Constructing children park in edavetty nagaravanam project&#x0d area
Read moreInstallation of new solar fencing(2 km) around edavetty nagaravanam project at edavetty reserve in thodupuzha range of kothamangalam division during 2023-24
Installation of energiser battery charge controle unit leadout cable
Read moreProviding walkway and entrence arch structure at edavetty nagaravanam project in thodupuzha range under kothamangalam division during 2023
Earthwork steelworkpainting cc pavorblock
Read moreof your Industry type