Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Tm Unit Ii Overhauling Of Crh Nr Vs Es 18 19 And Inspection Of Flash Tank I To Condenser Connected Metallic Expansion Bellow E6 During Unit Ii Coh And Rla Study Works 2024
|
Description |
Mtps I Tm Unit Ii Overhauling Of Crh Nr Vs Es 18 19 And Inspection Of Flash Tank I To Condenser Connected Metallic Expansion Bellow E6 During Unit Ii Coh And Rla Study Works 2024
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_507450_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT. 274 / 2024-25 |
Tender Fee | 0 |
EMD | 1200 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=603686 |
Start Date | December 04, 2024 23:30 |
End Date |
08/12/2024 ( Expired 156 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i tm unit i overhauling of olctc system pump lhs rhs inspection cleaning of condenser cw box steam side hot well olctc system ball collecting screen overhauling of 200 mm condenser air release cum vacuum breaking valve and condenser
Mtps i tm unit i overhauling of olctc system pump lhs rhs inspection cleaning of condenser cw box steam side hot well olctc system ball collecting screen overhauling of 200 mm condenser air release cum vacuum breaking valve and condenser
Read moreMtps i tm unit i overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit i during aoh 2025 26
Mtps i tm unit i overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit i during aoh 2025 26
Read moreMtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau
Mtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau
Read moreMtps i tm ii unit i complete overhauling and painting of service air compressors 1a 1b 1c
Mtps i tm ii unit i complete overhauling and painting of service air compressors 1a 1b 1c
Read moreMtps i tm ii unit i complete inspection and reconditioning of axial piston pump of hp lp bypass system oil supply unit
Mtps i tm ii unit i complete inspection and reconditioning of axial piston pump of hp lp bypass system oil supply unit
Read moreMtps i tm unit ii complete overhauling and painting of instrument air compressors iac 2a 2b 2c
Mtps i tm unit ii complete overhauling and painting of instrument air compressors iac 2a 2b 2c
Read moreMtps i tm ii unit i complete inspection and reconditioning of axial piston pump of hp lp bypass system oil supply unit
Mtps i tm ii unit i complete inspection and reconditioning of axial piston pump of hp lp bypass system oil supply unit
Read moreMtps i m i ca cws i fabrication of sun shield roof structure for replacing a portion of damaged corroded sun shield roof structure and its doors provided over hot water basin on the eastern side of cooling tower ii during coh 24 25 of unit ii
Mtps i m i ca cws i fabrication of sun shield roof structure for replacing a portion of damaged corroded sun shield roof structure and its doors provided over hot water basin on the eastern side of cooling tower ii during coh 24 25 of unit ii
Read moreMtps i tm unit ii overhauling of crh nrvs es 18 19 and inspection of flash tank i to condenser connected metallic expansion bellow e6 during unit ii coh and rla study works 2024
Mtps i tm unit ii overhauling of crh nrvs es 18 19 and inspection of flash tank i to condenser connected metallic expansion bellow e6 during unit ii coh and rla study works 2024
Read moreMtps i tm ii unit i complete overhauling and painting of instrument air compressors 1a 1b 1c
Mtps i tm ii unit i complete overhauling and painting of instrument air compressors 1a 1b 1c
Read moreof your Industry type