Tender Details

Particulars Details
Title
A. Construction Of 592 Nos. Pcc Steps For Travelling Roadways Location 1 Nd2 L To 1 Nd25 L In Hr Section Iv, B. Construction Of 154 Nos Pcc Steps For Travelling Roadways Location 1 Nd118 L To 1 Nd123 L In Hr Se C I.
Description
A. Construction Of 592 Nos. Pcc Steps For Travelling Roadways Location 1 Nd2 L To 1 Nd25 L In Hr Section Iv, B. Construction Of 154 Nos Pcc Steps For Travelling Roadways Location 1 Nd118 L To 1 Nd123 L In Hr Se C I.
Organisation Mahanadi Coalfields Limited | Public Sector Undertakings
Tender Id 2025_MCL_335187_1
Reference
Number
MCL/GM/OA/SO(M)/25/NIT256/918
Tender Fee 0
EMD 60000
Tender Value
Place Orient Colliery 1 and 2 Mine, OSA, OA, MCL
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=347474
Start Date May 12, 2025 15:30
End Date

22/05/2025 ( Expired 17 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Read more
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode

Read more
Construction of toll plaza at ch. 80.100 near narsi namdeo on risod to hingoli from km 44.220 to km 97.450 section of nh 461 b in the state of maharashtra on risk and cost of contractor on epc basis mode.

Construction of toll plaza at ch. 80.100 near narsi namdeo on risod to hingoli from km 44.220 to km 97.450 section of nh 461 b in the state of maharashtra on risk and cost of contractor on epc basis mode.

Read more
Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan

Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan

Read more
Ie services for construction of four laning of nanasa to pidgaon section of nh47 old nh59a indore harda pkgiii length 47.445km design ch. 95.000 km to 142.445 km under bharatmala pariyojna phase-i economic corridor in the state of mp on ham basis

Ie services for construction of four laning of nanasa to pidgaon section of nh47 old nh59a indore harda pkgiii length 47.445km design ch. 95.000 km to 142.445 km under bharatmala pariyojna phase-i economic corridor in the state of mp on ham basis

Read more
Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.

Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.

Read more

Mollarpur majipara bolpur road from 18.0 km to 31.3 km, strengthening work including construction of 10 nos. of cd structures under birbhum highway division no. i in the district of&amp#x0d birbhum.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise