Tender Details
Particulars | Details |
---|---|
Title |
Trank Linking &Amp Yard Remidelling Work Of Ajni &Amp Nagpur Yard (Phase Ii) And Balance Track Linking Work In Various Yards Between Wardha Nagpur Section In Connection With Wardha Nagpur 3rd &Amp 4th Line.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 76488072 |
Reference Number |
DYCE-C-NGP-03of2024 |
Tender Fee | 0 |
EMD | 17 Lakh |
Tender Value | |
Place | Mumbai CST |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/082024/76488072/viewNitPdf_4658524.pdf |
Start Date | July 28, 2024 01:36 |
End Date |
29/08/2024 ( Expired 284 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreConstruction of cc drains to srinagar 7/4th line north side and srinagar 7/5th line south side balance drain in div no.51 under ae-14 section.
Construction of cc drains to srinagar 7/4th line north side and srinagar 7/5th line south side balance drain in div no.51 under ae-14 section.
Read moreAnnual rate contract for removal of leakages and choking in pipe line and inter connection work of in jen section osian under sub dn. osian
Annual rate contract for removal of leakages and choking in pipe line and inter connection work of in jen section osian under sub dn. osian
Read moreAnnual rate contract for removal of leakages and choking in pipe line and inter connection work of in jen section tinwari - i under sub dn. tinwari
Annual rate contract for removal of leakages and choking in pipe line and inter connection work of in jen section tinwari - i under sub dn. tinwari
Read moreAnnual rate contract for removal of leakages and choking in pipe line and inter connection work of in jen section tinwari - ii under sub dn. tinwari
Annual rate contract for removal of leakages and choking in pipe line and inter connection work of in jen section tinwari - ii under sub dn. tinwari
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreGeneralr m 2025 26 rc 2 phase 1 zone iii one year running contract for various pwd roads under road section erumely in kottayam district 12 roads stretches for a length of 57.165 kmrc-general civil work
Generalr m 2025 26 rc 2 phase&#x0d 1 zone iii one year running contract for&#x0d various pwd roads under road section&#x0d erumely in kottayam district 12 roads&#x0d stretches for a length of 57.165 kmrc-general&#x0d civil work
Read moreSupply and delivery of 1800 nos rachyem indo macedon sintex equivalent make lt distribution junction box along with pole mounting clamps for service line 3 phase 4 wire connection in ab cable system to wbsedcls malda gazole and chanchal store
Supply and delivery of 1800 nos rachyem indo macedon sintex equivalent make lt distribution junction box along with pole mounting clamps for service line 3 phase 4 wire connection in ab cable system to wbsedcls malda gazole and chanchal store
Read moreMtps i chp i deep screening through packing lifting the track line ballast deficiency makeup work with 40mm hard broken stone ballast grinding the elongated edges of rails and reversing the grounded rails into its position in wagon tippler iii inhau
Mtps i chp i deep screening through packing lifting the track line ballast deficiency makeup work with 40mm hard broken stone ballast grinding the elongated edges of rails and reversing the grounded rails into its position in wagon tippler iii inhau
Read moreGeneral-2022-2023-balance work - ernakulam/thrippunithura -rm 2022-23-zone 2-one year running contract for various pwd roads undre road section thrippunithura in ernakulam district 6 road stretches for a length of 17km.
General-2022-2023-balance work -&#x0d ernakulam/thrippunithura -rm 2022-23-zone&#x0d 2-one year running contract for various pwd&#x0d roads undre road section thrippunithura in&#x0d ernakulam district 6 road stretches for a length&#x0d of 17km
Read moreof your Industry type