Tender Details

Particulars Details
Title
Cleaning Of Toe Drain And Longitudinal Drain Of Ds Slope Along With Bush Cutting In Earth Dam From Rd 0.00m To 1920m Earth Dam Of Lower Indra Irrigation Project
Description
Cleaning Of Toe Drain And Longitudinal Drain Of Ds Slope Along With Bush Cutting In Earth Dam From Rd 0.00m To 1920m Earth Dam Of Lower Indra Irrigation Project
Organisation CCE Lower Indra Irr. Project Nuapada | State Govt. and UT
Tender Id 2025_CCELI_112251_4
Reference
Number
SELICD 01/2025-26
Tender Fee 6000
EMD 12900
Tender Value
Place DAM SITE TIKHALI
Link https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=535542
Start Date April 07, 2025 15:30
End Date

17/04/2025 ( Expired 4 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.

Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.

Read more
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan

Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan

Read more
Biennial rate contract for sweeping cleaning of various locations of power house ecr ahp esp along with removal of deposited ash from various locations of unit 2 and 5 of btps

Biennial rate contract for sweeping cleaning of various locations of power house ecr ahp esp along with removal of deposited ash from various locations of unit 2 and 5 of btps

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Construction of cc drain from imam chowk to ho siddiq khan and mansoor vali in ward 08 maihar

Construction of cc drain from imam chowk to ho siddiq khan and mansoor vali in ward 08 maihar

Read more
Construction of drain and covering from badeveer neta house to river side, chhattar to khimma jatav, jamman panda to kishan jatav, dhanraj to gendalal, jagdish panda to kallu vanshkar in mata ward, nagar palika parishad, gadarwara

Construction of drain and covering from badeveer neta house to river side, chhattar to khimma jatav, jamman panda to kishan jatav, dhanraj to gendalal, jagdish panda to kallu vanshkar in mata ward, nagar palika parishad, gadarwara

Read more
Construction of road and drain from santosh kahar to lakhmichand jain in bhagat singh ward, nagar palika parishad, gadarwara

Construction of road and drain from santosh kahar to lakhmichand jain in bhagat singh ward, nagar palika parishad, gadarwara

Read more
Construction of drain from prahlad kushwaha to varma house and kanha kunj to awashthi kirana in niranjan ward, nagar palika parishad, gadarwara

Construction of drain from prahlad kushwaha to varma house and kanha kunj to awashthi kirana in niranjan ward, nagar palika parishad, gadarwara

Read more
Construction of drain from panchmukhi hanuman mandir to ramesh kahar, sunil thakur to arvind kevat and construction of drain and road from sourabh thakur to kevat golandaj in vivekanand ward, nagar palika parishad, gadarwara

Construction of drain from panchmukhi hanuman mandir to ramesh kahar, sunil thakur to arvind kevat and construction of drain and road from sourabh thakur to kevat golandaj in vivekanand ward, nagar palika parishad, gadarwara

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise