Tender Details
Particulars | Details |
---|---|
Title |
Repairing And Up Gradation Of Interlocking Road From Shri Ram Gopal Sharma House To Sharma Ji House In Mohalla Vidhya Nagar
|
Description |
Repairing And Up Gradation Of Interlocking Road From Shri Ram Gopal Sharma House To Sharma Ji House In Mohalla Vidhya Nagar
|
Organisation | Directorate of Local Bos UP | State Govt. and UT |
Tender Id | 2025_DOLBU_996407_1 |
Reference Number |
No-447/NPBA/2024-25 Dt 20.01.2025/12 |
Tender Fee | 190 |
EMD | 3165 |
Tender Value | |
Place | NAGAR PANCHAYAT BABARPUR-AJITMAL |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1766687 |
Start Date | January 22, 2025 19:30 |
End Date |
10/02/2025 ( Expired 117 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreConsultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.
Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreConstruction of mipi-andrathang road from km 20.000 to 50.000
Construction of mipi-andrathang road from km 20.000 to 50.000
 (design length 34.880 km between km 20.000 to 54.880)green field
 alignment to nhsl specifications in the aor of 62 rcc under 752 brtf
 of project udayak in arunachal pradesh state
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreWidening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreOne time improvement of bypassed stretches of the towns chundi, voletivaripalem, badevaripalem and kandukur from km. 143.320 to km.189.050 of nh 167b in the state of andhra pradesh on epc mode
One time improvement of bypassed stretches of the towns chundi, voletivaripalem, badevaripalem and kandukur from km. 143.320 to km.189.050 of nh 167b in the state of andhra pradesh on epc mode
Read moreof your Industry type