Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of C C Road And Drain At Abadi Portion And Maintenance Of Remaining Part Of Khirakwari Bhoorh To Nadha Road Link Road Link Road
|
| Description |
Construction Of C C Road And Drain At Abadi Portion And Maintenance Of Remaining Part Of Khirakwari Bhoorh To Nadha Road Link Road Link Road
|
| Organisation | Cheif Engineer Bareilly Zone PWD Bareilly | State Govt. and UT |
| Tender Id | 2024_CEBLY_987666_1 |
|
Reference Number |
10863(3)/7Nivida(CD ET)-08/24-25 Dt 18-12-2024 |
| Tender Fee | 2714 |
| EMD | 3.94 Lakh |
| Tender Value | |
| Place | BUDAUN |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1741787 |
| Start Date | December 28, 2024 14:30 |
| End Date |
Expired
04/01/2025
Expired 568 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreDesign, supply, installation and commissioning of double girder eot crane at ferrochrome plant of omc limited, jajpur road, odisha.
Design, supply, installation and commissioning of double girder eot crane at ferrochrome plant of omc limited, jajpur road, odisha.
Read moreUpgradation of existing 80 bedded golden jubilee hospital to a 300 bedded multi-disciplinary super specialty hospital at visakhapatnam port on design, built, finance, operate and transfer (dbfot) basis.
Upgradation of existing 80 bedded golden jubilee hospital to a 300 bedded multi-disciplinary super specialty hospital at visakhapatnam port on design, built, finance, operate and transfer (dbfot) basis.
Read moreConstruction of c c road and drain at abadi portion of jarifnagar samaspur bhoorh thanur nadha road odr km 5
Construction of c c road and drain at abadi portion of jarifnagar samaspur bhoorh thanur nadha road odr km 5
Read moreSpecial repair work in 2023-24 at construction of c c road and drain at abadi portion of sahaswan nadha road to bhagtanagla surkhi link road and construction of c c road and drain at sahaswan nadha road km. 16 to kharakwari bhoorh link road
Special repair work in 2023-24 at construction of c c road and drain at abadi portion of sahaswan nadha road to bhagtanagla surkhi link road and construction of c c road and drain at sahaswan nadha road km. 16 to kharakwari bhoorh link road
Read moreSpecial repair work in 2023-24 at construction of c c road and drain at abadi portion of sahaswan nadha road to bhagtanagla surkhi link road and construction of c c road and drain at sahaswan nadha road km. 16 to kharakwari bhoorh link road
Special repair work in 2023-24 at construction of c c road and drain at abadi portion of sahaswan nadha road to bhagtanagla surkhi link road and construction of c c road and drain at sahaswan nadha road km. 16 to kharakwari bhoorh link road
Read moreConstruction of c c road and drain at abadi portion of sahaswan nadha road to nawabganj behatvi link road
Construction of c c road and drain at abadi portion of sahaswan nadha road to nawabganj behatvi link road
Read moreConstruction of c c road and drain at abadi portion of sahaswan nadha road to mirzapur mohsin link road
Construction of c c road and drain at abadi portion of sahaswan nadha road to mirzapur mohsin link road
Read moreof your Industry type