Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Ttps Mech Ii Bm Unit I Cleaning Of I Ii Pass Boiler Structures Prds Valves And Pipe Lines Floor And Disposal Of Fly Ash Debris Etc From Boiler Area To Debris Yard For The Period From 01 04 2025 To 31 03 2026
|
Description |
Ttps Mech Ii Bm Unit I Cleaning Of I Ii Pass Boiler Structures Prds Valves And Pipe Lines Floor And Disposal Of Fly Ash Debris Etc From Boiler Area To Debris Yard For The Period From 01 04 2025 To 31 03 2026
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_527399_1 |
Reference Number |
CE/TTPS/SE/M-II/No.34/2025-26 |
Tender Fee | 0 |
EMD | 12400 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=628024 |
Start Date | February 24, 2025 19:30 |
End Date |
11/03/2025 ( Expired 109 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Read moreNctps ii mi circle bm division unit ii boiler cleaning of boiler i pass heating surface tubes from
Nctps ii mi circle bm division unit ii boiler cleaning of boiler i pass heating surface tubes from
Read moreTtps mech ii ahp ash slurry disposal lines in unit i ii strengthening of 340 mm od cast basalt pipes by provision of reinforcement m s plates over the corroded m s outer shell of the pipes in line no 5 of unit i ii ash slurry disposal lines in be
Ttps mech ii ahp ash slurry disposal lines in unit i ii strengthening of 340 mm od cast basalt pipes by provision of reinforcement m s plates over the corroded m s outer shell of the pipes in line no 5 of unit i ii ash slurry disposal lines in be
Read moreMtps i bm unit i boiler pressure parts aoh 2025 cleaning of boiler structures from 0 to 52 m level etc
Mtps i bm unit i boiler pressure parts aoh 2025 cleaning of boiler structures from 0 to 52 m level etc
Read moreKtps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Read more50/2024-25/edcr annual maintenance work of underground cable of 11 kv ht and lt lines of 288 no. dtrs in rampur town under the jurisdiction of edd-i, rampur from 04/2025 to 31-03-2026
50/2024-25/edcr annual maintenance work of underground cable of 11 kv ht and lt lines of 288 no. dtrs in rampur town under the jurisdiction of edd-i, rampur from 04/2025 to 31-03-2026
Read moreCritical repair works and movement of locos dozers from railway marshaling yard to loco shed/maintenance pit/dozer shed/diesel bunk and back to railway marshalling yard /pile, coal yard in lem/chp/dr nttps during the period from 01/04/2025 or from the date of commencement of work to 31/03/2026.
Critical repair works and movement of locos dozers from railway marshaling yard to loco shed/maintenance pit/dozer shed/diesel bunk and back to railway marshalling yard /pile, coal yard in lem/chp/dr nttps during the period from 01/04/2025 or from the date of commencement of work to 31/03/2026.
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site
Read moreSweeping of all the roads, cleaning of storm water drains, lifting and transportation of garbage (to the recognized dumping yard near textile park madikonda) of industrial park warangal and kakatiya autonagar warangal for a period of twelve months i.e., from 01-04-2025 to 31-03-2026. (with iala funds)
Sweeping of all the roads, cleaning of storm water drains, lifting and transportation of garbage (to the recognized dumping yard near textile park madikonda) of industrial park warangal and kakatiya autonagar warangal for a period of twelve months i.e. from 01-04-2025 to 31-03-2026. (with iala funds)
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Read moreof your Industry type