Tender Details

Particulars Details
Title
Preparation Of Detailed Project Report For Widening Strengthening Reconstruction Of Tukda Bengal Border To Mishrikata Chow K Aamdangra Bengal Border Via Shyamsundarpur Road, Under Chakuliya Block Tentative Length 10 Km And 2 Joem Chowk To Bengal Bo
Description
Preparation Of Detailed Project Report For Widening Strengthening Reconstruction Of Tukda Bengal Border To Mishrikata Chow K Aamdangra Bengal Border Via Shyamsundarpur Road, Under Chakuliya Block Tentative Length 10 Km And 2 Joem Chowk To Bengal Bo
Organisation RCD EinC | State Govt. and UT
Tender Id 2024_CECOM_96111_1
Reference
Number
RCD/PIDIV./15/2024-25(2ND CALL)
Tender Fee 5000
EMD 30000
Tender Value
Place CHAKULIYA
Link https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=129153
Start Date November 29, 2024 16:30
End Date

12/12/2024 ( Expired 207 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road

Consultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Link road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram (2nd call)

Link road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram under jhargram division, p.w.dte under ridf-xxx., project id - pd242529252s000

Read more
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Read more
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Read more
Widening strengthening and reconstruction of pakur-barharwa main road (12th km of nh133a) to pali gagan pahadi west bengal border via kushma fatak road (length-6.630 km.) under road division pakur for the year- 2025-26

Widening strengthening and reconstruction of pakur-barharwa main road (12th km of nh133a) to pali gagan pahadi west bengal border via kushma fatak road (length-6.630 km.) under road division pakur for the year- 2025-26

Read more
Up gradation of rural road from sh 10 sh 8 to guptapara ii community hall sh7 under pmgsyiii batchi, 2024 25 package no. an01fe111 length 6.200 km re call

Up gradation of rural road from sh 10 sh 8 to guptapara ii community hall sh7 under pmgsyiii batchi, 2024 25 package no. an01fe111 length 6.200 km re call

Read more
Strengthening of mubarakpur to bhankharpur road rd 0.34 km to 1.60 km (odr-05) in distt. sas nagar with 5 year maintenance (1st year defect liability period under 5054 rb-10 roads)

Strengthening of mubarakpur to bhankharpur road rd 0.34 km to 1.60 km (odr-05) in distt. sas nagar with 5 year maintenance (1st year defect liability period under 5054 rb-10 roads)

Read more
Strengthening of bahadurgarh ghanour road to ghanour via chappar manjoli (odr-37) in distt. sas nagar with 5 year maintenance (1 year defect liability period) under head 5054 rb-10 roads

Strengthening of bahadurgarh ghanour road to ghanour via chappar manjoli (odr-37) in distt. sas nagar with 5 year maintenance (1 year defect liability period) under head 5054 rb-10 roads

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise