Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Preparation Of Detailed Project Report For Widening Strengthening Reconstruction Of Tukda Bengal Border To Mishrikata Chow K Aamdangra Bengal Border Via Shyamsundarpur Road, Under Chakuliya Block Tentative Length 10 Km And 2 Joem Chowk To Bengal Bo
|
Description |
Preparation Of Detailed Project Report For Widening Strengthening Reconstruction Of Tukda Bengal Border To Mishrikata Chow K Aamdangra Bengal Border Via Shyamsundarpur Road, Under Chakuliya Block Tentative Length 10 Km And 2 Joem Chowk To Bengal Bo
|
Organisation | RCD EinC | State Govt. and UT |
Tender Id | 2024_CECOM_96111_1 |
Reference Number |
RCD/PIDIV./15/2024-25(2ND CALL) |
Tender Fee | 5000 |
EMD | 30000 |
Tender Value | |
Place | CHAKULIYA |
Link | https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=129153 |
Start Date | November 29, 2024 16:30 |
End Date |
12/12/2024 ( Expired 207 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road
Consultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreLink road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram (2nd call)
Link road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram under jhargram division, p.w.dte under ridf-xxx., project id - pd242529252s000
Read moreRehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreConstruction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Read moreWidening strengthening and reconstruction of pakur-barharwa main road (12th km of nh133a) to pali gagan pahadi west bengal border via kushma fatak road (length-6.630 km.) under road division pakur for the year- 2025-26
Widening strengthening and reconstruction of pakur-barharwa main road (12th km of nh133a) to pali gagan pahadi west bengal border via kushma fatak road (length-6.630 km.) under road division pakur for the year- 2025-26
Read moreUp gradation of rural road from sh 10 sh 8 to guptapara ii community hall sh7 under pmgsyiii batchi, 2024 25 package no. an01fe111 length 6.200 km re call
Up gradation of rural road from sh 10 sh 8 to guptapara ii community hall sh7 under pmgsyiii batchi, 2024 25 package no. an01fe111 length 6.200 km re call
Read moreStrengthening of mubarakpur to bhankharpur road rd 0.34 km to 1.60 km (odr-05) in distt. sas nagar with 5 year maintenance (1st year defect liability period under 5054 rb-10 roads)
Strengthening of mubarakpur to bhankharpur road rd 0.34 km to 1.60 km (odr-05) in distt. sas nagar with 5 year maintenance (1st year defect liability period under 5054 rb-10 roads)
Read moreStrengthening of bahadurgarh ghanour road to ghanour via chappar manjoli (odr-37) in distt. sas nagar with 5 year maintenance (1 year defect liability period) under head 5054 rb-10 roads
Strengthening of bahadurgarh ghanour road to ghanour via chappar manjoli (odr-37) in distt. sas nagar with 5 year maintenance (1 year defect liability period) under head 5054 rb-10 roads
Read moreof your Industry type