Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Replacement Of Existing Conventional Street Light With Energy Efficient Led Street Light And Installation Of Ccms Panels For Smart Lighting System, Establishment Of Command And Control Center For It Infrastructure To Monitor Smart Lighting System....
|
| Description |
Replacement Of Existing Conventional Street Light With Energy Efficient Led Street Light And Installation Of Ccms Panels For Smart Lighting System, Establishment Of Command And Control Center For It Infrastructure To Monitor Smart Lighting System....
|
| Organisation | Government of Haryana |
| Tender Id | 2024_HRY_341376_1 |
|
Reference Number |
2024098E6B36 E4FF 4826 86BB C72E8306FD44281ULB |
| Tender Fee | 15000 |
| EMD | 5.32 Lakh |
| Tender Value | - |
| Place | Municipal Corporation Panchkula |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in |
| Start Date | January 03, 2024 22:30 |
| End Date |
Expired
05/02/2024
Expired 981 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Composite work for establishment of electrical, civil, fire and it infrastructure for scada disaster recovery centre at 66/11 kv ess b.d marg.
Composite work for establishment of electrical, civil, fire and it infrastructure for scada disaster recovery centre at 66/11 kv ess b.d marg.
Read moreSelection of project management consultant (pmc) to design, develop, manage, and implement the integrated command and control centre (iccc), cctv surveillance system, optical fiber communication (ofc) network, and other it-enabled infrastructure pro
Selection of project management consultant (pmc) to design, develop, manage, and implement the integrated command and control centre (iccc), cctv surveillance system, optical fiber communication (ofc) network, and other it-enabled infrastructure pro
Read moreSelection of a project management consultant (pmc) to design, develop, manage, and implement the integrated command and control centre (iccc), cctv surveillance system, optical fiber communication (ofc) network, and other it-enabled infrastructure pr
Selection of a project management consultant (pmc) to design, develop, manage, and implement the integrated command and control centre (iccc), cctv surveillance system, optical fiber communication (ofc) network, and other it-enabled infrastructure pr
Read moreSupply, delivery, installation, configuration, testing, migration, and commissioning of layer-3 core network switches, layer-3 server access switches,layer-2 distribution switches, optical fibre connectivity and associated network infrastructure in replacement of end-of-life network devices for efficient server communication, network traffic management, optimum internet bandwidth utilization and future ready scalable network architecture under gm(it)
Supply, delivery, installation, configuration, testing, migration, and commissioning of layer-3 core network switches, layer-3 server access switches,layer-2 distribution switches, optical fibre connectivity and associated network infrastructure in replacement of end-of-life network devices for efficient server communication, network traffic management, optimum internet bandwidth utilization and future ready scalable network architecture under gm(it)
Read moreDecorative lightning pole (v2),suppliying and fixiing 5 a to 32 a rationg as per boq,earthing with copper earth plate 600 mm x 600 mm x 3 mm thick as per boq,supplying and laying 25 mm x 5 mm g.i strip,supplying and laying 6 swg g l wire,supplying and laying of following size dwc hdpe pipe,63 mm dia hdpe pipe coupler,laying of one number pvc insulated and pvc sheathed xlpe power cable,aluminium lugs for 25 sq mm cable,supplying and fixing of light class g.l. pipe of 50 mm dia,sitc group controller unit suitable for mounting in feeder pillars fabricated from crca sheet steel of suitable gauge,sitc ccms software in the nagar nigam palika room for managing the smart led streetlight network,fixing of led street light fitting,amc for complete street lighting project 5 years,sitc armerd cable conformity of the specification for xlpe cableas
Decorative lightning pole (v2),suppliying and fixiing 5 a to 32 a rationg as per boq,earthing with copper earth plate 600 mm x 600 mm x 3 mm thick as per boq,supplying and laying 25 mm x 5 mm g.i strip,supplying and laying 6 swg g l wire,supplying and laying of following size dwc hdpe pipe,63 mm dia hdpe pipe coupler,laying of one number pvc insulated and pvc sheathed xlpe power cable,aluminium lugs for 25 sq mm cable,supplying and fixing of light class g.l. pipe of 50 mm dia,sitc group controller unit suitable for mounting in feeder pillars fabricated from crca sheet steel of suitable gauge,sitc ccms software in the nagar nigam palika room for managing the smart led streetlight network,fixing of led street light fitting,amc for complete street lighting project 5 years,sitc armerd cable conformity of the specification for xlpe cableas
Read moreSurvey work, preparation of dpr, for the installation of ccms panels for smart street lighting system establishment of command and control for it infrastructure to monitor smart lighting system (approx 3300 no.)
Survey work, preparation of dpr, for the installation of&#x0d ccms panels for smart street lighting system&#x0d establishment of command and control for it&#x0d infrastructure to monitor smart lighting system&#x0d (approx 3300 no.)&#x0d
Read moreSupply, installation and upgradation of street light, energy meter ccms panels for smart lighting system establishment of command and control centre for it infrastructure to monitor smart street lighting at municipal council kalka haryana
Supply, installation and upgradation of street light, energy meter ccms panels for smart lighting system establishment of command and control centre for it infrastructure to monitor smart street lighting at municipal council kalka haryana
Read moreSurvey work, preparation of dpr, for the installation of ccms panels for smart street lighting system establishment of command and control for it infrastructure to monitor smart lighting system and integrated with existing smart street light system
Survey work, preparation of dpr, for the installation of ccms panels for smart street lighting system establishment of command and control for it infrastructure to monitor smart lighting system and integrated with existing smart street light system
Read moreHiring of agency for the survey work, preparation of dpr etc for the installation of ccms panels for smart lighting system, establishment of command and control centre for it infrastructure to monitor smart lighting system.
Hiring of agency for the survey work, preparation of dpr etc for the installation of ccms panels for smart lighting system, establishment of command and control centre for it infrastructure to monitor smart lighting system.
Read moreHiring of agency for the survey work, preparation of dpr etc for the installation of ccms panels for smart lighting system, establishment of command and control centre for it infrastructure to monitor smart lighting system.
Hiring of agency for the survey work, preparation of dpr etc for the installation of ccms panels for smart lighting system, establishment of command and control centre for it infrastructure to monitor smart lighting system.
Read moreof your Industry type