Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cleaning Of Vertical Porous Drains On Pawana Dam Repair To Upstream Stone Pitching Between Envelope Portion Of Earthen And Masonry Dam And Other Allied Works
|
| Description |
Cleaning Of Vertical Porous Drains On Pawana Dam&Amp#X0d
Repair To Upstream Stone Pitching&Amp#X0d
Between Envelope Portion&Amp#X0d
Of Earthen And Masonry Dam And Other Allied Works
|
| Organisation | CE-Water Resources Dept. Pune | State Govt. and UT |
| Tender Id | 2026_CWRDP_1290245_2 |
|
Reference Number |
Tender Notice No 42 (IIIrd Call Notice No 22) For 2025-26 |
| Tender Fee | 2860 |
| EMD | 26000 |
| Tender Value | - |
| Place | Pawananagar |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2218102 |
| Start Date | March 25, 2026 20:35 |
| End Date |
Expired
01/04/2026
Expired 197 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreUpstream and downstream treatment of masonry joints, drilling and grouting of masonry dam structure of chandraprabha dam.
Upstream and downstream treatment of masonry joints, drilling and grouting of masonry dam structure of chandraprabha dam.
Read moreMaintainance and repairing to pitching near nof and earthen dam junction pitching of gosikhurd national project.
Maintainance and repairing to pitching near nof and earthen dam junction pitching of gosikhurd national project.
Read moreRepair of disturbed and settled upstream side dam pitching of waghadi medium project.
Repair of disturbed and settled upstream side dam pitching of waghadi medium project.
Read moreCleaning by redrilling of vertical porous drain pipe in gallary of hatnur dam
Cleaning by redrilling of vertical porous drain pipe in gallary of hatnur dam.
Read moreIhep -providing pitching to the upstream slope and slope protection works at downstream of kulamavu saddle dam
Ihep -providing pitching to the upstream slope and slope protection works at downstream of kulamavu saddle dam
Read moreCleaning of vertical porous drain pipes in the drainage gallery of hatnur dam using redrilling
Cleaning of vertical porous drain pipes in the drainage gallery of hatnur dam using redrilling
Read moreRepairing of pitching on upstream face of saddle dam no 3 of dhamani dam of surya major project tal-vikramgad dist-palghar
Repairing of pitching on upstream face of saddle dam no 3 of dhamani dam of surya major project tal-vikramgad dist-palghar
Read moreRepairing of pitching on upstream face of saddle dam no 2 of dhamani dam of surya major project tal-vikramgad dist-palghar
Repairing of pitching on upstream face of saddle dam no 2 of dhamani dam of surya major project tal-vikramgad dist-palghar
Read moreRepairing of pitching on upstream face of saddle dam no 4 of dhamani dam of surya major project tal-vikramgad dist-palghar
Repairing of pitching on upstream face of saddle dam no 4 of dhamani dam of surya major project tal-vikramgad dist-palghar
Read moreof your Industry type