Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Re Drilling Against Defunct At Alampur H.D.T.W. (B.N. 396)
|
| Description |
Re Drilling Against Defunct At Alampur H.D.T.W. (B.N. 396) Under Katwa I Development Block Within Katwa(a I) Sub Division Under Burdwan(a I) Division In The District Of Purba Bardhaman Under Core Sector Programme.
|
| Organisation | WATER RESOURCES DEV. DTE. | State Govt. and UT |
| Tender Id | 2025_WRDD_954785_1 |
|
Reference Number |
WRDD/BDNAID/11/2025-26/Gr.B of E.E AI BURDWAN |
| Tender Fee | 0 |
| EMD | 53000 |
| Tender Value | - |
| Place | Purba Bardhaman |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2288719 |
| Start Date | November 20, 2025 23:30 |
| End Date |
Expired
17/12/2025
Expired 300 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Carrying out re-routing of existing 10.75 inch od pipe section of paradip raipur ranchi pipeline prrpl by horizontal directional drilling hdd method at ch. 116 km saraipalli korba section in chhattisgarh
Carrying out re-routing of existing 10.75 inch od pipe section of paradip raipur ranchi pipeline prrpl by horizontal directional drilling hdd method at ch. 116 km saraipalli korba section in chhattisgarh
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreRe-drilling against defunct ghumuria h.d.t.w. (b.n.-428)
Re-drilling against defunct at ghumuria &#x0d h.d.t.w. (b.n.-428) under katwa-ii development block within katwa(a-i) &#x0d sub division under burdwan(a-i) division &#x0d in the district of purba bardhaman under &#x0d core sector programme.
Read moreRe-drilling against defunct at ehaipur-i h.d.t.w. (b.n.-459)
Re-drilling against defunct at ehaipur-i h.d.t.w. (b.n.-459) under ketugram-i development block within katwa(a-i) sub division under burdwan(a-i) division in the district of purba bardhaman under core sector programme.
Read moreRe-drilling against defunct at purba gopalpur h.d.t.w. (b.n.-409)
Re-drilling against defunct at purba gopalpur h.d.t.w. (b.n.-409) under mangal kote development block within katwa(a-i) sub division under burdwan(a-i) division in the district of purba bardhaman under core-sector programme
Read moreRe-drilling against defunct tubewell at kandra h.d.t.w. (bn-393)
Re-drilling against defunct tubewell at kandra h.d.t.w. (bn-393) under ketugram-i development block within katwa(a-i) sub division under burdwan(a-i) division in the district of purba bardhaman under core sector programme
Read moreRe-drilling against defunct tubewell at jakta-ii h.d.t.w. (bn-229 )
Re-drilling against tubewell at jakta-ii h.d.t.w. (bn-229 ) under raina-i development block within burdwan (a-i) sub division under burdwan(a-i) division in the district of purba bardhaman under core sector programme
Read moreRe-drilling against tubewell at medgachi h.d.t.w. (bn-432 )
Re-drilling against tubewell at medgachi h.d.t.w. (bn-432 ) under kalna-i development block within kalna-i (a-i) sub division under burdwan(a-i) division in the district of purba bardhaman under core sector programme
Read moreRe-drilling against tubewell at ghanashyampur h.d.t.w. (bn-354 )
Re-drilling against tubewell at ghanashyampur h.d.t.w. (bn-354 ) under kalna-i development block within kalna-i (a-i) sub division under burdwan(a-i) division in the district of purba bardhaman under core sector programme
Read moreof your Industry type