Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Job 9 Construction Of Link Road Nangal Khurd To Upper Manuwal To Lower Mannuwal Rd 0 0 To 1 600 Sub Head C.O Cc Pavement And Drain At Rd 1 400 To 1 600 Under Otmnp
|
| Description |
Job 9 Construction Of Link Road Nangal Khurd To Upper Manuwal To Lower Mannuwal Rd 0 0 To 1 600 Sub Head C.O Cc Pavement And Drain At Rd 1 400 To 1 600 Under Otmnp
|
| Organisation | Government of Himachal Pradesh |
| Tender Id | 2023_PWD_74631_1 |
|
Reference Number |
Job 9 Construction of link road Nangal Khurd to U |
| Tender Fee | 500 |
| EMD | 23100 |
| Tender Value | - |
| Place | Executive Engineer, Una Division, HPPWD, Una |
| Link |
View Original Tender Notice
https://hptenders.gov.in |
| Start Date | June 09, 2023 14:30 |
| End Date |
Expired
30/06/2023
Expired 1202 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Lower birshella to upper birshella link road km 2nd rd(800-1000) km 3rd rd (0-500)
As per nit/sbd
Read morePuljora upper lower khul improvement of upper khul rd 195 to 250m rd 280 to 390m and 530 to 840m and lower khul rd 135 to 670m.
Puljora upper lower khul improvement of upper khul rd 195 to 250m rd 280 to 390m and 530 to 840m and lower khul rd 135 to 670m.
Read moreUpper lower panthal khul-renovation and strengthening of khul from rd 0 to 160m by construction of retaining and parapet walls and laying of channel bed
Upper lower panthal khul-renovation and strengthening of khul from rd 0 to 160m by construction of retaining and parapet walls and laying of channel bed
Read moreR/o rain damages on link road to village dhar in km 0/0 to 1/500 (sh p/l interlocking tile at rd 0/150 to 0/160, 0/300 to 0/330 and 0/600 to 0/610). 2nd call
R/o rain damages on link road to village dhar in km 0/0 to 1/500 (sh p/l interlocking tile at rd 0/150 to 0/160, 0/300 to 0/330 and 0/600 to 0/610). 2nd call
Read moreMacadamization of chinar mohalla to qilla mohalla km 1st rd (300-600) km 2nd rd (0-250) (under city and town roads 2026-27) (4th call)
Macadamization of chinar mohalla to qilla mohalla km 1st rd (300-600) km 2nd rd (0-250) (under city and town roads 2026-27) (4th call)
Read moreR/o rain damages on bhini johri luns to kharpana road in km 0/0 to 7/00 (sh c/o r/wall at rd 1/560 to 1/600).
R/o rain damages on bhini johri luns to kharpana road in km 0/0 to 7/00 (sh c/o r/wall at rd 1/560 to 1/600).
Read moreR/o rain damages on bhini johri luns to kharpana road in km 0/0 to 7/00 (sh c/o 900 mm dia np-2 hpc at rd 3/600).
R/o rain damages on bhini johri luns to kharpana road in km 0/0 to 7/00 (sh c/o 900 mm dia np-2 hpc at rd 3/600).
Read moreTralla lower khul improvement and strengthening of khul by construction of parapets and retaining walls in cement concrete 1 3 6 and laying of channel bed in cement concrete 1 2 4 from rd 0 to 600 m and 800 to 2200 m
Tralla lower khul improvement and strengthening of khul by construction of parapets and retaining walls in cement concrete 1 3 6 and laying of channel bed in cement concrete 1 2 4 from rd 0 to 600 m and 800 to 2200 m
Read morePalma upper khul improvement and strengthening of khul by construction of parapets and retaining walls in cement concrete 1 3 6 and laying of channel bed in cement concrete 1 2 4 from rd 0 to 530 m and 600 to 1050
Palma upper khul improvement and strengthening of khul by construction of parapets and retaining walls in cement concrete 1 3 6 and laying of channel bed in cement concrete 1 2 4 from rd 0 to 530 m and 600 to 1050
Read moreRestoration rain damages on khanotiyon to bassali road km 0/0 to 13/0 (sh c/o 900mm dia hume pipe culvert along with both side wing walls at rd 1/500 and 1/600) under pdna 2025
Restoration rain damages on khanotiyon to bassali road km 0/0 to 13/0 (sh c/o 900mm dia hume pipe culvert along with both side wing walls at rd 1/500 and 1/600) under pdna 2025
Read moreof your Industry type