Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Store Room, Raising Of Compound Wall And Flooring Of Elsr At Elsr 2 Compound In Gandhi Nagar 36th Division
|
Description |
Construction Of Store Room, Raising Of Compound Wall And Flooring Of Elsr At Elsr 2 Compound In Gandhi Nagar 36th Division
|
Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 460 |
EMD | 13000 |
Tender Value | |
Place | AP |
Link |
AAAAAAAAAA Login to view |
Start Date | May 29, 2025 04:00 |
End Date |
11/06/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConstruction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.
Read moreCurve improvements at km 41.500 on nh-69 black spot id ka 05 37 and construction of rcc culvert at km 35.600 on honnasagar section in the state karnataka on epc mode
Curve improvements at km 41.500 on nh-69 black spot id ka 05 37 and construction of rcc culvert at km 35.600 on honnasagar section in the state karnataka on epc mode
Read moreConstruction of 48.10 m. bridge over barana khad at km. 37.120 and 74.20 m. borewali khad at km. 38.580 and lvup at km. 37.425 on nh503 extn. in the state of hp.
Construction of 48.10 m. bridge over barana khad at km. 37.120 and 74.20 m. borewali khad at km. 38.580 and lvup at km. 37.425 on nh503 extn. in the state of hp.
Read moreConstruction of rrm protection wall at new tower no.: 04
Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreW.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.
Read moreDevelopment of multi modal logistics park (mmlp) at varanasi in the state of uttar pradesh on engineering, procurement and construction mode
Development of multi modal logistics park (mmlp) at varanasi in the state of uttar pradesh on engineering, procurement and construction mode
Read moreConstruction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)
Read moreof your Industry type