Tender Details
Particulars | Details |
---|---|
Title |
Providing Electrical Installation, Service Connection ,1x 20 K Va Ea Set And Aviation Obstruction Lamp For Phase Ix.2 Bts Sites In Alappuzha Ba
|
Description |
Providing Electrical Installation, Service Connection ,1x 20 K Va Ea Set And Aviation Obstruction Lamp For Phase Ix.2 Bts Sites In Alappuzha Ba
|
Organisation | Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings |
Tender Id | 2025_BSNL_230935_1 |
Reference Number |
KRLCO-13/16(11)/15/2025-ELEC |
Tender Fee | 590 |
EMD | 15199 |
Tender Value | |
Place | BTS sites ALP BA |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=260403 |
Start Date | March 22, 2025 23:30 |
End Date |
07/04/2025 ( Expired 63 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Bts outsourcing /t-071/ hisar ba
Tender for outsourcing of maintenance and operation of mobile bts sites/rural exchanges in hisar ba
Read moreSpecial repair to pipe line connection for low water pressure to oht in block no ml 132 133 134 oml 69 70 97 of milkha singh colony and ug sump of nml (or) at mceme and spl repair to standby generator set 160 kva against ber at eme records und
Special repair to pipe line connection for low water pressure to oht in block no ml 132 133 134 oml 69 70 97 of milkha singh colony and ug sump of nml (or) at mceme and spl repair to standby generator set 160 kva against ber at eme records und
Read moreSupply installation testing and commissioning of dedicated 100 kva substation along with ht/lt network for providing of dedicated 3 phase power supply at mount view filling station hiller bahie.
Supply installation testing and commissioning of dedicated 100 kva substation along with ht/lt network for providing of dedicated 3 phase power supply at mount view filling station hiller bahie.
Read moreSupply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata
Supply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata
Read moreSupply and delivery of 1800 nos rachyem indo macedon sintex equivalent make lt distribution junction box along with pole mounting clamps for service line 3 phase 4 wire connection in ab cable system to wbsedcls malda gazole and chanchal store
Supply and delivery of 1800 nos rachyem indo macedon sintex equivalent make lt distribution junction box along with pole mounting clamps for service line 3 phase 4 wire connection in ab cable system to wbsedcls malda gazole and chanchal store
Read moreProviding annual comprehensive maintenance contract and operation of internal and external electrical installation with 2 multiply by 500 kva h.t. transformer of indira gandhi mahila evam bal chikitsalaya gas rahat bhopal
Providing annual comprehensive maintenance contract and operation of internal and external electrical installation with 2 multiply by 500 kva h.t. transformer of indira gandhi mahila evam bal chikitsalaya gas rahat bhopal
Read moreCarrying out various instrumentation works for part b as per standard specification by providing all required materials in connection with the composite works for setting up of hpg-2, butene-1 and psa units at lepetkata, assam of m/s bcpl
Carrying out various instrumentation works for part b as per standard specification by providing all required materials in connection with the composite works for setting up of hpg-2, butene-1 and psa units at lepetkata, assam of m/s bcpl
Read moreEstimate for construction of new 11 kv ht line and 3 - phase lt line and lt re-organization to proposed 25 kva ,11/0.4 kv s/stn thalehar in (e) section ahju under electrical sub- division, hpsebl, chauntra
Estimate for construction of new 11 kv ht line and 3 - phase lt line and lt re-organization to proposed 25 kva ,11/0.4 kv s/stn thalehar in (e) section ahju under electrical sub- division, hpsebl, chauntra
Read moreFor partial repairing and installation of buchholz relay, winding and oil temperature meters of 500kva, 11kv/440v lighting transformer make kva process ltd sl no 11/1380 of sector 2 substation of east basuria colliery in respect of kusunda area.
For partial repairing and installation of buchholz relay, winding and oil temperature meters of 500kva, 11kv/440v lighting transformer make kva process ltd sl no 11/1380 of sector 2 substation of east basuria colliery in respect of kusunda area.
Read moreWork of meter installation on new single phase connection of 01 to 04 kw for jhatpat/ niveshmitra applied consumers and others under deposit scheme in the area of edd-iii (jaunpur nagar)
Work of meter installation on new single phase connection of 01 to 04 kw for jhatpat/ niveshmitra applied consumers and others under deposit scheme in the area of edd-iii (jaunpur nagar)
Read moreof your Industry type