Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Strengthening Of Road Ing From Ambassa Ganganagar Road To Champarai Para From Ch.0.00 Km To Ch.4.25 Km (L 4.25 Km) During The Year 2024 2025
|
| Description |
Sh Patch Metalling, Grouting, Carpeting/ Re Carpeting, Seal Coating, Constn. Of Unlined Surface Drain, Placing Of Gunny Bags Etc.
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2025_CEPWD_57856_1 |
|
Reference Number |
135/DNIT/SE-V/AMB/2024-25 |
| Tender Fee | 4000 |
| EMD | 2.91 Lakh |
| Tender Value | - |
| Place | Ambassa |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=58839 |
| Start Date | February 01, 2025 23:15 |
| End Date |
Expired
07/02/2025
Expired 615 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of road from promodnagar mairung kwrwi road to mayung bekreng tsr camp ch. 0.00 km to ch. 2.50 km under tulasikhar block during the year 2026 27 sh wbm 3, carpeting, seal coat and surface drains etc.
Development of road from promodnagar mairung kwrwi road to mayung bekreng tsr camp ch. 0.00 km to ch. 2.50 km under tulasikhar block during the year 2026 27 sh wbm 3, carpeting, seal coat and surface drains etc.
Read moreFdr protection work at nimai nath para and balaram fiii li scheme from erosion of river dhalai under wr sub division ambassa during the year 2026 27 sh protection work by providing bamboo palasiding gunny bag etc.
Fdr protection work at nimai nath para and balaram fiii li scheme from erosion of river dhalai under wr sub division ambassa during the year 2026 27 sh protection work by providing bamboo palasiding gunny bag etc.
Read moreJjm scheme, south tripura sh construction of rcc cwr, pump house, pumping, electrical and mechanical works, pipeline, fhtcs and allied works at k.r. para, gagan ch. para vc, satchand rd block, under dws sub-division, sabroom, during 2026-27.
Jjm scheme, south tripura sh construction of rcc cwr, pump house, pumping, electrical and mechanical works, pipeline, fhtcs and allied works at k.r. para, gagan ch. para vc, satchand rd block, under dws sub-division, sabroom, during 2026-27.
Read moreDevelopment of road from mangalpada para to nalchar l2.697 km portion from ch 0.0 km to ch 0.900 km l0.900 km total prlength 0.900 km within nalchar rdblock under the jurisdiction of melaghar pwd (randb) subdivision during the fy 2026 27
Sh patch wbm grouting recarpeting brass seal coat and allied works
Read moreDevelopment of road from kalarbari to dayalshing para (l-7.0 km) (portion from ch-4.0 km to ch- 5.0 km, l- 1.0 km) total pr length1.0 km within nalchar rd block under the jurisdiction of melaghar pwd (randb) subdivision during the fy 202627
Sh patch wbm grouting recarpeting and allied works
Read moreStrengthening of road ing from ambassa - ganganagar road to champarai para from ch.5.00 km to ch.9.25 km (l- 4.25 km) during the year 2024-2025
Sh- patch metalling, grouting, carpeting/ re-carpeting, seal coating, constn. of unlined surface drain, placing of gunny bags etc.
Read moreShifting of existing di_upvc drinking water pipeline along with other accessories ing from ambassa to salema border towards ambassa (ch-0.00 to ch-4.00km)
Shifting of existing di_upvc drinking water pipeline along with other accessories ing from ambassa to salema border towards ambassa (ch-0.00 to ch-4.00km)
Read moreShifting of existing di/upvc drinking water pipeline along with other accessories ing from ambassa-salema border towards ambassa (ch-0.00 to ch-4.00km) (2nd call)
Shifting of existing di/upvc drinking water pipeline along with other accessories ing from ambassa-salema border towards ambassa (ch-0.00 to ch-4.00km) (2nd call)
Read moreMtc. of east barjala to sadhumani para road ing from ch.0.00 km to ch.0.130km
Side shouldering unlined surface drain , grouting, re-carpeting, seal coat etc. during 2024-25
Read moreFdr/ urgent mtc. of ambassa - ganganagar road to udashin para (upto katanjoy para) road (length -5.50 km) during the year 2024-2025
Sh- constn. of r.c.c retaining wall at different spots in between ch. 0.00 km to 5.50 km and patch metalling, grouting, re-carpeting, seal coating, restoration of damaged road formation, constn. of unlined surface drain, placing of gunny bags etc.
Read moreof your Industry type