Particulars | Details |
---|---|
Title |
Dismantling, Repairing And Alignment Of Pump And Motor Base Of Unit 612 3 Heavy Media Pump At 11 Mtr. Level And Vertical Sump Pump/ Sala Pump At 0 Mtr. Level At Washery Building At Moonidih Coal Washery.
|
Description |
Dismantling, Repairing And Alignment Of Pump And Motor Base Of Unit 612 3 Heavy Media Pump At 11 Mtr. Level And Vertical Sump Pump/ Sala Pump At 0 Mtr. Level At Washery Building At Moonidih Coal Washery.
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_326520_1 |
Reference Number |
BCCL/PO/MND/EnM/E -Tender/2024-25/E 1443 |
Tender Fee | 0 |
EMD | 3500 |
Tender Value | |
Place | MOONIDIH WASHERY |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=338440 |
Start Date | January 23, 2025 14:30 |
End Date |
30/01/2025 ( Expired 151 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repair/ replacement of pump control panel, pump, motors, earthings, borewell pump motor, copper cable, aviation lighting, protection, water level indicators and allied works at div unit area, 54 idsr, 554 asc, 654 eme bn, assay line, map jco/ or accn
Repair/ replacement of pump control panel, pump, motors, earthings, borewell pump motor, copper cable, aviation lighting, protection, water level indicators and allied works at div unit area, 54 idsr, 554 asc, 654 eme bn, assay line, map jco/ or accn
Read moreReplacement of damaged coupling of 4 cusec 30 mtr hc pump of unit no. 3 and minor repairs to 250 kva electric transformer at lis didwara.
Replacement of damaged coupling of 4 cusec 30 mtr hc pump of unit no. 3 and minor repairs to 250 kva electric transformer at lis didwara.
Read moreDismantling, shifting and fitting of old motor, base and coupling, fabrication and erection of new motor, base and coupling fitting and assembling etc. of pump no. 1 and 3 (river side) including making of flange as per required under kathara washery
Dismantling, shifting and fitting of old motor, base and coupling, fabrication and erection of new motor, base and coupling fitting and assembling etc. of pump no. 1 and 3 (river side) including making of flange as per required under kathara washery
Read moreRepairing of side guard and skart rubber, channel, angle, joist and plate etc. of unit no. 52 and 74 belt conveyor of raw coal section at kathara washery
Repairing of side guard and skart rubber, channel, angle, joist and plate etc. of unit no. 52 and 74 belt conveyor of raw coal section at kathara washery
Read moreNctps i es circle em ii dn sdn i unit iii overhauling of ht pa fan motor 3a sl no 32277 p 401 02 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit iii
Nctps i es circle em ii dn sdn i unit iii overhauling of ht pa fan motor 3a sl no 32277 p 401 02 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit iii
Read moreNctps i es circle em ii dn s dn i unit ii overhauling of ht id fan motor 2b sl no 32348 p 401 01 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit ii
Nctps i es circle em ii dn s dn i unit ii overhauling of ht id fan motor 2b sl no 32348 p 401 01 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit ii
Read moreDismantling of pump from base plate n pipe line and running repairing of dsm -6 pump (1000gpm) (kgw shed) and commissioning the pump wnp, make-kirloskar having punch sl. no. bnk/iwsp/dsm6/kgw/02 on base plate after repair with alignment
Dismantling of pump from base plate n pipe line and running repairing of dsm -6 pump (1000gpm) (kgw shed) and commissioning the pump wnp, make-kirloskar having punch sl. no. bnk/iwsp/dsm6/kgw/02 on base plate after repair with alignment
Read moreRepairing and thorough overhauling of gear box gs-14a and repairing of its base and supporting structure including changing of new sprocket of unit no. 268 belt conveyor at 00 level in hydro cyclone section of kathara washery
Repairing and thorough overhauling of gear box gs-14a and repairing of its base and supporting structure including changing of new sprocket of unit no. 268 belt conveyor at 00 level in hydro cyclone section of kathara washery
Read moreA)repairing, of shaft for 8 gay pump of unit no. 652 and 653 b)complete repairing and overhauling of pedestal for 8 gay pump in unit no. 652 and standby in the fine coal section at kathara washery
A)repairing, of shaft for 8 gay pump of unit no. 652 and 653 b)complete repairing and overhauling of pedestal for 8 gay pump in unit no. 652 and standby in the fine coal section at kathara washery
Read more1) erection of 3.3 kv over head line installation of 3000 gpm pump at ampl sump for fire fighting of ampl coal dump akwmc,ocp katras area.(2) dismantling and diversion of 6.6 kv power feeder for placement of electrical drill at ocp of akwmc
1) erection of 3.3 kv over head line installation of 3000 gpm pump at ampl sump for fire fighting of ampl coal dump akwmc,ocp katras area.(2) dismantling and diversion of 6.6 kv power feeder for placement of electrical drill at ocp of akwmc