Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Urgent: Special Repair Bid For Ichari Dam 🌊 The Maharatna Company, Ujjain Ventures (Md Ujvn), Along With The State Government And Union Territories, Is Calling For Bids For The Special Repair Of Critical Components At The Ichari Dam. 🛠️ 📅 Bid Submission Deadline: May 03, 2024, 5:00 Pm 💸 Tender Fee: Inr 29,500 💰 Earnest Money Deposit (Emd): Inr 42,39,500 The Project Involves The Repair Of Spillway And Roller Buckets, As Well As The Pitching Retaining Wall Of The Approach Road. Interested Bidders Must Have The Necessary Expertise And Resources To Undertake This Complex And Critical Infrastructure Project. Keywords: Spillway Repair, Roller Bucket, Ichari Dam, Ujjain Ventures, State Govt. And Ut, Infrastructure Project, Bid Submission, Tender Fee, Emd| Particulars | Details |
|---|---|
| Title |
Special Repair Of Spillway And Roller Bucket Of Bay No 3 4 5 Cc Blocks Beyond The Roller Buckets Of All Spillway And Pitching Retaining Wall Of Approach Road Of Ichari Dam
|
| Description |
Special Repair Of Spillway And Roller Bucket Of Bay No 3 4 5 Cc Blocks Beyond The Roller Buckets Of All Spillway And Pitching Retaining Wall Of Approach Road Of Ichari Dam
|
| Organisation | MD- UJVN | State Govt. and UT |
| Tender Id | 2024_UJVN_70467_1 |
|
Reference Number |
32/EE/PCM-DKP/TN/2023-24 |
| Tender Fee | 29500 |
| EMD | 42.4 Lakh |
| Tender Value | - |
| Place | Ichari dam |
| Link |
View Original Tender Notice
https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=84627 |
| Start Date | March 05, 2024 15:30 |
| End Date |
Expired
03/05/2024
Expired 890 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Under water replacement of sill beam, t- guide and bottam back guide of spillway log gates no- 05 and 07 of ichari dam
Under water replacement of sill beam, t- guide and bottam back guide of spillway log gates no- 05 and 07 of ichari dam
Read moreRepair of dam spillway bucket no. 4 using high performance concrete and repair of side walls of dam spillway no. 3 and 4 using epoxy mortar at dul dam, dps, kishtwar
Repair of dam spillway bucket no. 4 using high performance concrete and repair of side walls of dam spillway no. 3 and 4 using epoxy mortar at dul dam, dps, kishtwar
Read moreRepair of damaged/eroded portions of spillway glacis, spillway, divide wall, training wall spillway buckets and silt excluder gallery with epoxy mortar, cementitious mortar and hpc of concrete dam of salal power station.
Repair of damaged/eroded portions of spillway glacis, spillway, divide wall, training wall spillway buckets and silt excluder gallery with epoxy mortar, cementitious mortar and hpc of concrete dam of salal power station.
Read moreSpecial repairs to spillway gate x 02 nos at chouldhari dam under ge minnie bay port blair
Special repairs to spillway gate x 02 nos at chouldhari dam under ge minnie bay port blair
Read moreSpecial repairs to spillway gate x 02 nos at chouldhari dam under ge minnie bay port blair
Special repairs to spillway gate x 02 nos at chouldhari dam under ge minnie bay port blair
Read moreRestoration and protection work of collapsed wet stone pitching in right bank of guide wall of lower dam spillway under ppsp site, bagmundi, purulia.
Restoration and protection work of collapsed wet stone pitching in right bank of guide wall of lower dam spillway under ppsp site, bagmundi, purulia.
Read moreHubballi division: improvement to waterway bridges like pitching, flooring, retaining wall etc,.in aden/bay section. (maintenance period 03 months)
For complete deion and other details, please refer to tender
Read moreRepair of eroded/damaged portion of spillway glacis along with sill beam of radial gate bay no 3 at dam of chamera-ii power station, chamba (hp)
Repair of eroded/damaged portion of spillway glacis along with sill beam of radial gate bay no 3 at dam of chamera-ii power station, chamba (hp)
Read moreConcreting work in the eroded areas near the roller bucket between radial gate no. 26 to 29 of hatnur dam
Concreting work in the eroded areas near the roller bucket between radial gate no. 26 to 29 of hatnur dam
Read moreConcreting work in the eroded areas near the roller bucket between radial gate no. 1 to 5 of hatnur dam
Concreting work in the eroded areas near the roller bucket between radial gate no. 1 to 5 of hatnur dam
Read moreof your Industry type