Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Co District Office (G Plus 4) At Palashbari, Kamrup District, Assam On Engineering, Procurement And Construction (Epc) Mode 1
|
| Description |
Construction Of Co District Office (G Plus 4) At Palashbari, Kamrup District, Assam On Engineering, Procurement And Construction (Epc) Mode 1
|
| Organisation | Public Works Building and NH Department | State Govt. and UT |
| Tender Id | 2025_PWBNH_45174_1 |
|
Reference Number |
CE/TB-VII/64/2025/8 |
| Tender Fee | 20000 |
| EMD | 34.79 Lakh |
| Tender Value | - |
| Place | Palashbari |
| Link |
View Original Tender Notice
https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=71520 |
| Start Date | June 25, 2025 21:30 |
| End Date |
Expired
14/07/2025
Expired 455 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call
Consultancy services ae for supervision of upgradation to 4lps configuration of the nashik to peth section of nh-848 (length -36.371 km) in the state of maharashtra on epc mode.- 2nd call
Read moreDesign, build, construct, install, and commissioning of compost plant of 42 tpd for wet 02 waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria.
Design, build, construct, install, and commissioning of compost plant of 42 tpd for wet 02 waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria.
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria
Design, build, construct, install, and commissioning of material recovery facility (mrf) of 10 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode under nagar parishad khagaria
Read moreDesign, construction, installation and commissioning (epc mode) of material recovery facility (mrf) for dry waste management of 05 tpd capacity for office of nagar panchayat chandi (nalanda) and operation and maintenance (o&m) of the plant for next 5 years
Design, construction, installation and commissioning (epc mode) of material recovery facility (mrf) for dry waste management of 05 tpd capacity for office of nagar panchayat chandi (nalanda) and operation and maintenance (o&m) of the plant for next 5 years
Read moreConstruction of rcc g5 ps building at palashbari ps of kamrup district assam under moitri scheme on engineering procurement and construction epc mode 1 basis.
Construction of rcc g5 ps building at palashbari ps of kamrup district assam under moitri scheme on engineering procurement and construction epc mode 1 basis.
Read moreDesign and construction of 100 bedded new district hospital in azara kamrup assam in epc mode
Design and construction of 100 bedded new district hospital in azara kamrup assam in epc mode
Read moreInfrastructure development of muduki anchalik janajatiya high school of palashbari lac, dist kamrup
Infrastructure development of muduki anchalik janajatiya high school of palashbari lac, dist kamrup
Read moreConstruction and upgradation of north guwahati college at amingaon, kamrup, assam (proposed construction of academic cum administrative, library and auditorium building (rcc g plus 3)) on engineering, procurement and construction (epc) mode-1 basis
Construction and upgradation of north guwahati college at amingaon, kamrup, assam (proposed construction of academic cum administrative, library and auditorium building (rcc g plus 3)) on engineering, procurement and construction (epc) mode-1 basis
Read moreConstruction / renovation of 2 (two) p.s. buildings at kamrup dist , assam on epc mode. (group-11)
Construction / renovation of 2 (two) p.s. buildings at kamrup dist , assam on epc mode. (group-11)
Read moreConstruction / renovation of 4 (four) p.s. buildings at kamrup dist , assam on epc mode. (group-10)
Construction / renovation of 4 (four) p.s. buildings at kamrup dist , assam on epc mode. (group-10)
Read moreof your Industry type