Tender Details
Particulars | Details |
---|---|
Title |
Planning , Design, Engineering, Construction, Fabrication , Erection, Supply, Installation, Testing, Trial Run And Commissioning Of Sewage Treatment Plant (2.0 Mld)
|
Description |
Planning , Design, Engineering, Construction, Fabrication , Erection, Supply, Installation, Testing, Trial Run And Commissioning Of Stp (2.0 Mld) Consisting Of All Civil , Structural , En M Works On Turnkey Basis Including O And M Of Plant For 5 Year
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_329947_1 |
Reference Number |
BCCL/CED/TC/eNIT-63/24-25/1327 dated 20.02.2025 |
Tender Fee | 0 |
EMD | 12.64 Lakh |
Tender Value | |
Place | Koyla Nagar |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=342017 |
Start Date | February 22, 2025 20:30 |
End Date |
10/03/2025 ( Expired 88 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreSupply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreSupply,installation, testing, commissioning and training of electrical, fire alarm and detection, fire fighting, vac and bms works for nine elevated stations
Sholinganallur lake to sipcot 2 station including stabling lines, viaduct between the stations (ch 35044.000 to 44671.000) for corridor- 3 of chennai metro rail project phase-ii.
Read morePre despatch inspection, supply, installation, commissioning and warranty of graphical application server setup with high bandwidth network
Pre-despatch inspection, supply, installation, commissioning and warranty of graphical application server setup with high bandwidth network
Read moreSupply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26
Supply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26
Read moreSupply testing, installation and commissioning of machinery equipment instrument hand tools etc for different cts trade courses at industrial training institute gariahat
Supply testing, installation and commissioning of machinery equipment instrument hand tools etc for different cts trade courses at industrial training institute gariahat
Read moreSupply installation commissioning and maintaining 02 units of fully automatic biochemistry analyzers on reagent rental basis for dept of biochemistry at aiims bhubaneswar for a period of five years from letter of award
Supply installation commissioning and maintaining 02 units of fully automatic biochemistry analyzers on reagent rental basis for dept of biochemistry at aiims bhubaneswar for a period of five years from letter of award
Read moreConstruction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreImplementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreof your Industry type