Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Design, Supply And Installation Of Highway Lighting At 17 Locations On Krishnagiri To Walajahpet Section Of Nh 48 (Old Nh 46) In The State Of Tamil Nadu On An Item Rate (Percentage) Basis
|
Description |
Design, Supply And Installation Of Highway Lighting At 17 Locations On Krishnagiri To Walajahpet Section Of Nh 48 (Old Nh 46) In The State Of Tamil Nadu On An Item Rate (Percentage) Basis
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2025_NHAI_233024_1 |
Reference Number |
NHAI/RO-Chennai/NH-48-Highway Lighting/2024-25/212 |
Tender Fee | 10000 |
EMD | 9.18 Lakh |
Tender Value | |
Place | Krishnagiri to Walajahpet section of NH-48 |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=263477 |
Start Date | April 17, 2025 23:00 |
End Date |
02/06/2025 ( Expired 23 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Independent engineer services for 4 laning of marakkanam-puducherry section of nh-332a in tamil nadu on ham (project length-46 km) (mahabalipuram-puducherry package-iii)
Independent engineer services for 4 laning of marakkanam-puducherry section of nh-332a in tamil nadu on ham (project length-46 km) (mahabalipuram-puducherry package-iii)
Read more4 laning of rajapalayam to shenkottai section of nh-744 from km 71.600 to km 139900 (design chainage) in tamil nadu on hybrid annuity mode (project length68.3km).
4 laning of rajapalayam to shenkottai section of nh-744 from km 71.600 to km 139900 (design chainage) in tamil nadu on hybrid annuity mode (project length68.3km).
Read moreConstruction of fob at km 382.510 and construction of service road from km.410/680 to km 411.260 along with new minor bridge on bhs in dindigul to samayanallaur section of nh-44 in the state of tamil nadu on item rate basis (3rd call)
Construction of fob at km 382.510 and construction of service road from km.410/680 to km 411.260 along with new minor bridge on bhs in dindigul to samayanallaur section of nh-44 in the state of tamil nadu on item rate basis (3rd call)
Read moreImprovement measures at 02 potential blackspot locations from km 164.980 to km 165.640 (bobasar junction) and km 181.250 to km 182.350 (current balaji junction) on salasar nagaur section of nh 58 in the state of rajasthan on item rate (percentage)
Improvement measures at 02 potential blackspot locations from km 164.980 to km 165.640 (bobasar junction) and km 181.250 to km 182.350 (current balaji junction) on salasar nagaur section of nh 58 in the state of rajasthan on item rate (percentage)
Read moreConstruction of bypass to gangaikonda cholapuram in kallagam to meensurutti section of nh-81 (old nh-227) in tamil nadu on epc mode
Construction of bypass to gangaikonda cholapuram in kallagam to meensurutti section of nh-81 (old nh-227) in tamil nadu on epc mode
Read moreConst of sr works of flyover at km. 936.440 (jonnada jn), flyover at km 967.180 (undrajavaram jn) and flyover at km 910.760 (morampudi jn) at the risk and cost of contractor in the section of nh-216a in the state of ap on item rate (percentage) basis
Const of sr works of flyover at km. 936.440 (jonnada jn), flyover at km 967.180 (undrajavaram jn) and flyover at km 910.760 (morampudi jn) at the risk and cost of contractor in the section of nh-216a in the state of ap on item rate (percentage) basis
Read moreConstruction of foot over bridge at km 27.005 (kandamangalam near govt. school) and km 28.885 (navamal kapper) on viluppuram to puducherry section of nh 332 (old nh 45a) in the state of tamil nadu and puducherry (ut)
Construction of foot over bridge at km 27.005 (kandamangalam near govt. school) and km 28.885 (navamal kapper) on viluppuram to puducherry section of nh 332 (old nh 45a) in the state of tamil nadu and puducherry (ut)
Read moreRepair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town from km 565.850 to km 569.600 of east-west corridor of nh-27 (old nh-14) in the state of gujarat on item rate (percentage) basis at risk and cost of contractor
Repair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town from km 565.850 to km 569.600 of east-west corridor of nh-27 (old nh-14) in the state of gujarat on item rate (percentage) basis at risk and cost of contractor
Read moreShort term oandm work of 4/6 lanning of karodi (km 320.104) to telwadi (km 375.000) road of nh-211 (new nh no. 52) (existing length 54.896 km design length 55.610 km) in the state of maharashtra under nhdp phase iv-b on item rate (percentage) basis
Short term oandm work of 4/6 lanning of karodi (km 320.104) to telwadi (km 375.000) road of nh-211 (new nh no. 52) (existing length 54.896 km design length 55.610 km) in the state of maharashtra under nhdp phase iv-b on item rate (percentage) basis
Read moreImprovement works including highway lighting repair and rehabilitation of structures road safety works etc on sa to bilaspur section of nh 130 in the state of chhattisgarh on item rate basis
Improvement works including highway lighting repair and rehabilitation of structures road safety works etc on sa to bilaspur section of nh 130 in the state of chhattisgarh on item rate basis
Read moreof your Industry type