Tender Details

Particulars Details
Title
False Ceiling Works In Moi Control Room
Description
False Ceiling Works In Moi Control Room
Organisation Hindustan Petroleum Corporation Limited | Public Sector Undertakings
Tender Id 127050
Reference
Number
2400014558-HB-06600
Tender Fee 0
EMD 0
Tender Value -
Place Visakhapatnam
Link
View Original Tender Notice

http://tenders.hpcl.co.in/tenders/tender_prog/Tenders_details.asp?id=127050

Start Date July 22, 2024 15:30
End Date
Expired 02/08/2024

Expired 783 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Developmental works in kothapally dumpingyard in huzurabad municipality under 14thfc grants(invited under earmarked works-sc communities are only eligible to participate)-2nd call

Developmental works in kothapally dumpingyard in huzurabad municipality under 14thfc grants(invited under earmarked works-sc communities are only eligible to participate)-2nd call

Read more
Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs raidurg, serilingampally (m) in ranga reddy district

Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs raidurg, serilingampally (m) in ranga reddy district

Read more
Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs miyapur, serilingampally (m) in ranga reddy district

Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs miyapur, serilingampally (m) in ranga reddy district

Read more
Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs darga (um), serilingampally (m) in ranga reddy district

Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs darga (um), serilingampally (m) in ranga reddy district

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis

Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.

Read more
False ceiling works in ccr control room at hwpm.

False ceiling works in ccr control room at hwpm.

Read more
False ceiling works in esp electrical control room at rinl vizag

False ceiling works in esp electrical control room, scope of works includes supply of gypsum ceiling materials, support frames and erection in 3 ecrs (electronic control rooms) of esps of unit # 2 to 5 (4 x 330 tph boilers) in tpp at rinl-vizag.

Read more
Repair/renovation of false flooring and false ceiling in spp control room and ccr control room in alumina plant nalco, damanjodi

Repair/renovation of false flooring and false ceiling in spp control &#x0d room and ccr control room in alumina plant nalco, damanjodi

Read more
False ceiling work at barrak of old control room, ratlam

False ceiling work at barrak of old control room, ratlam

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise