Tender Details

Particulars Details
Title
Supply Of Non Metallic Expansion Bellow
Description
Supply Of Non Metallic Expansion Bellow
Organisation Department of Fertilisers | Central Govt. Ministry/Department
Tender Id 2025_MCF_792461_1
Reference
Number
NFP/PUR/SB/240204/2523522
Tender Fee 0
EMD 25000
Tender Value -
Place NFL
Link
View Original Tender Notice

https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1102007

Start Date May 07, 2025 23:00
End Date
Expired 10/05/2025

Expired 520 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Expansion of academic section 2 at 2nd floor of old opd block, nims

Expansion of academic section 2 at 2nd floor of old opd block, nims

Read more
Different sizes of rubber expansion joints (bellows) in water system of cam division of ktps-vi stage

Different sizes of rubber expansion joints (bellows) in water system of cam division of ktps-vi stage

Read more
Expansion and extra floor of community hall near rajalingam garden, ward no.4(under sdf scheme) (6th recall)

Expansion and extra floor of community hall near rajalingam garden, ward no.4(under sdf scheme) (6th recall)

Read more
Providing barbed wire fencing along the boundary of diverted forest land and boundary of srp oc-ii expansion project mine, srirampur area, mancherial dist., t.g.

Providing barbed wire fencing along the boundary of diverted forest land and boundary of srp oc-ii expansion project mine, srirampur area, mancherial dist., t.g.

Read more
Procurement of refrigerant non cfcri 34a air conditioner for use at srpocp srp area-reg.

Procurement of refrigerant non cfcri 34a air conditioner for use at srpocp srp area-reg.

Read more
Comprehensive operation and maintenance and special repair of 110 nos ward level piped water supply schemes (non quality) & 16 nos pws scheme based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bill for five years. no. of schemes: wls(non quality): 110 pws(non quality): 16 p h division jhanjharpur

Comprehensive operation and maintenance and special repair of 110 nos ward level piped water supply schemes (non quality) & 16 nos pws scheme based on item rates; constructed by the public health engineering department including payment to the pump operators, electricity bill for five years. no. of schemes: wls(non quality): 110 pws(non quality): 16 p h division jhanjharpur

Read more
Bmd-availing the services to carry out various non-destructive examinations (nde) in 1x500mw boiler during upcoming capital overhauls 2026-27

Bmd-availing the services to carry out various non-destructive examinations (nde) in 1x500mw boiler during upcoming capital overhauls 2026-27

Read more
Procurement of rear view mirror for non costcap shovels, 75t and 40t cranes and 12t cranes working at rgocp-iii, rg-ii area

Procurement of rear view mirror for non costcap shovels, 75t and 40t cranes and 12t cranes working at rgocp-iii, rg-ii area

Read more
Quotation rate for non sr item for installation of motors diesel general servicing and carrying out other necessary works in wet wells under vijayapura city corporation limits.

Quotation rate for non sr item for installation of motors diesel general servicing and carrying out other necessary works in wet wells under vijayapura city corporation limits.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise