Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Boundary Wall And Fixing Of Chain Link Fencing Around Pond At Nihal Singh Wala
|
Description |
Construction Of Boundary Wall And Fixing Of Chain Link Fencing Around Pond At Nihal Singh Wala
|
Organisation | Department of Local Government | State Govt. and UT |
Tender Id | 2024_DLG_119038_1 |
Reference Number |
04/NSW |
Tender Fee | 2492 |
EMD | 25300 |
Tender Value | |
Place | NIHAL SINGH WALA |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=279751 |
Start Date | April 10, 2025 14:30 |
End Date |
24/04/2025 ( Expired 20 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Read moreConstruction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Construction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Read moreRoad,boundary wall and drainage work at cycle park within vidyasagar industrial park, kharagpur
Compound road with drainage system and peripheral boundary wall at cycle park (20 acres) within vidyasagar industrial park, kharagpur-i in the district of paschim medinipur
Read moreConstruction of flyover at kawas patiya at km14.400 and vup at reliance at km11.220 on nh53 of surat hazira section in gujarat on epc mode
Construction of flyover at kawas patiya at km14.400 and vup at reliance at km11.220 on nh53 of surat hazira section in gujarat on epc mode
Read moreConstruction of engineering hall-1 (back-end facility for lwr - llwmp)
Construction of engineering hall-1 (back-end facility for lwr - llwmp) and other miscellaneous works at barc, visakhapatnam, a.p.
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreConstruction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Construction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Read moreConstruction of 6 lane vup at junction of nh-148b (4-l) and nh-709e (4-l) on bhiwani bypass bhiwani in bhiwani district
Construction of 6 lane vup at junction of nh-148b (4-l) and nh-709e (4-l) on bhiwani bypass bhiwani in bhiwani district
Read moreRestoration or face-lifting of the front and side of factory building including lifting/ removal of plants and trees from the wall, parapet, roof etc. at old s r mint
Restoration or face-lifting of the front and side of factory building including lifting/ removal of plants and trees from the wall, parapet, roof etc. at old s r mint
Read more04/wbza/mld of 2024-25 (2nd call)
Construction of boundary wall length-615m at adina deer park
Read moreof your Industry type