Tender Details
Particulars | Details |
---|---|
Title |
Construction Of A Site Ro Within Urban Municipal Limits Of Aalo, Not On Nh Sh, West Siang District, Arunachal Pradesh.
|
Description |
Construction Of A Site Ro Within Urban Municipal Limits Of Aalo, Not On Nh Sh, West Siang District, Arunachal Pradesh.
|
Organisation | IndianOil | Central Govt. Ministry/Department |
Tender Id | 2024_ERO_181478_1 |
Reference Number |
RCC/ERO/37/2024-25/LT-93 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | West Siang, Arunachal Pradesh |
Link | https://iocletenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=191681 |
Start Date | October 25, 2024 19:30 |
End Date |
01/11/2024 ( Expired 224 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreOne time improvement of bypassed stretch of pamuru town from km. 109.950 to km. 116.750 of nh 167b in prakasam district in the state of andhra pradesh on epc mode
One time improvement of bypassed stretch of pamuru town from km. 109.950 to km. 116.750 of nh 167b in prakasam district in the state of andhra pradesh on epc mode
Read moreConstruction of rcc draintotal 8.06 km of nh-512 nh division vii
Construction of rcc drain for a total 8.06 km of nh-512 under nh div. no. vii, p.w. (roads)directorate in the district of dakshin dinajpur west bengal on epc mode job no.512/wb/2025-26/569
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read more2nd call for construction installation trial run and commissioning of three nos desiccant de humidification system for 200 mt capacity de humidified godown based on paddy at tepania under gomati district ad nagar under west tripura district and telia
2nd call for construction installation trial run and commissioning of three nos desiccant de humidification system for 200 mt capacity de humidified godown based on paddy at tepania under gomati district ad nagar under west tripura district and telia
Read moreIndependent engineering services for construction of four laning of areraj-bettiah starting from areraj (0.500) near sh-54 and terminating near village gurwalia biswas (41.080) at nh-727 of nh-139w in the state of bihar on ham mode
Independent engineering services for construction of four laning of areraj-bettiah starting from areraj (0.500) near sh-54 and terminating near village gurwalia biswas (41.080) at nh-727 of nh-139w in the state of bihar on ham mode
Read moreConstruction of four laning of areraj-bettiah starting from areraj (0.500) near sh-54 and terminating near village gurwalia biswas (41.080) at nh-727 of nh-139w in the state of bihar on ham mode
Construction of four laning of areraj-bettiah starting from areraj (0.500) near sh-54 and terminating near village gurwalia biswas (41.080) at nh-727 of nh-139w in the state of bihar on ham mode
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreof your Industry type