Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Road Moh. Kote To Nallah Pyt.Dara Baghyal Mandi Poonch W.No 01 By Way Of Earth Work,Balance Work And Shingle Metal
|
| Description |
Construction Of Road Moh. Kote To Nallah Pyt.Dara Baghyal Mandi Poonch W.No 01 By Way Of Earth Work,Balance Work And Shingle Metal
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_PWDJK_237505_1 |
|
Reference Number |
e-NIT No.194/2023-24 dated 20-11-2023 |
| Tender Fee | 600 |
| EMD | 7840 |
| Tender Value | |
| Place | Office of Executive Engineer PWD |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | November 20, 2023 23:30 |
| End Date |
Expired
13/12/2023
Expired 934 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of nallah from mangal murti plaza to main road. 2509
Construction of nallah from mangal murti plaza to main road. 2509
Read moreConstruction of dvor building at rupsi airport. sh civil and internal electrification work balance works
Construction of dvor building at rupsi airport. sh civil and internal electrification work balance works
Read moreReplacement to joinery, plumbing work, sanitary fittings and allied works at poonch under age b/r-ii of ge 881 ews
Replacement to joinery, plumbing work, sanitary fittings and allied works at poonch under age b/r-ii of ge 881 ews
Read more01(e) /po/k-i of 2026-2027, sl02
Construction of cement concrete road from mohosen house to hasen skhouse at khaltipur chand mandal (3209014013/rc/yd/320201060635695)
Read moreBalance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, (length - 27.00 km)
Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, 
 (length - 27.00 km)
Read moreEarth work in berms cutting, removal thecks in bed and strenthening of banks from km 0.200 to 33.000 at various reaches of shahjahanpur branch
Earth work in berms cutting, removal thecks in bed and strenthening of banks from km 0.200 to 33.000 at various reaches of shahjahanpur branch
Read moreUpgradation and beautification of chaudhary brahm prakash chowk and surrounding islands on pusa road, new delhi under sub-division-iii, swr-i, pwd (gnctd) (sh civil, electrical and horticulture works) (balance work)
Upgradation and beautification of chaudhary brahm prakash chowk and surrounding islands on pusa road, new delhi under sub-division-iii, swr-i, pwd (gnctd) (sh civil, electrical and horticulture works) (balance work)
Read moreConstruction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)
Construction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConsultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Read moreof your Industry type