Tender Details

Particulars Details
Title
Annual Cleaning And Upkeeping Of Erection And Dozer Section Of Dipka Expansion Project Of Dipka Area.
Description
Annual Cleaning And Upkeeping Of Erection And Dozer Section Of Dipka Expansion Project Of Dipka Area.
Organisation South Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_SECL_318643_1
Reference
Number
SECL/DA/CIV/e-TENDER/24-25/79 Dt 10/10/2024
Tender Fee 0
EMD 17200
Tender Value -
Place DIPKA CG
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330729

Start Date October 11, 2024 22:30
End Date
Expired 22/10/2024

Expired 720 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Expansion of academic section 2 at 2nd floor of old opd block, nims

Expansion of academic section 2 at 2nd floor of old opd block, nims

Read more
Repairing of radiator assly of dozer catd11t sl. no. ama00919, wheel dozer 834k sl. no. 749 dozer bd155 sl. no. 13629,13784, bd355 dozer sl. no. 11657, grader bg825 sl. no. 3244, 3253 and radiator assly of escort rt40 crane, uttam 12t crane, dumper b

Repairing of radiator assly of dozer catd11t sl. no. ama00919, wheel dozer 834k sl. no. 749 dozer bd155 sl. no. 13629,13784, bd355 dozer sl. no. 11657, grader bg825 sl. no. 3244, 3253 and radiator assly of escort rt40 crane, uttam 12t crane, dumper b

Read more
Procurement of brace for dozer at rgoc-1

Procurement of brace for dozer at rgoc-1

Read more
De-paralleling of 2nos. 80mva ptrs and erection of new 33kv pt set to 33kv bus section-iii and erection of 100kva station transformer at 132kv ss asifnagar in omc/metro-cetnral circle/metro zone-i

De-paralleling of 2nos. 80mva ptrs and erection of new 33kv pt set to 33kv bus section-iii and erection of 100kva station transformer at 132kv ss asifnagar in omc/metro-cetnral circle/metro zone-i

Read more
Engaging of tractor mounted front end dozer blade for sanitation activities in bellampally municipality

Engaging of tractor mounted front end dozer blade for sanitation activities in bellampally municipality

Read more
Minor repairs to sweeping macine, jatayuvu and dozer for sanitation purpose in khammam municipal corporation

Minor repairs to sweeping macine, jatayuvu and dozer for sanitation purpose in khammam municipal corporation

Read more
Different sizes of rubber expansion joints (bellows) in water system of cam division of ktps-vi stage

Different sizes of rubber expansion joints (bellows) in water system of cam division of ktps-vi stage

Read more
Expansion and extra floor of community hall near rajalingam garden, ward no.4(under sdf scheme) (6th recall)

Expansion and extra floor of community hall near rajalingam garden, ward no.4(under sdf scheme) (6th recall)

Read more
Design, engineering, supply, erection and commissioning of 2nd man riding chair lift system with a rope spacing of 1200mm for a length of 1200mtrs in 3 seam at ktkoc-iii project underground section , bhupalapalli area-reg.

Design, engineering, supply, erection and commissioning of 2nd man riding chair lift system with a rope spacing of 1200mm for a length of 1200mtrs in 3 seam at ktkoc-iii project underground section , bhupalapalli area-reg.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise