Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Filling Of 53500.00 Cum By Loose Dumped Ob
|
| Description |
Filling Of 53500.00 Cum By Loose Dumped Ob For Stabilization And Protective Measures Against Illegal Mining For Jogidih Colliery Under Govindpur Area.
|
| Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
| Tender Id | 2025_BCCL_326923_1 |
|
Reference Number |
BCCL/GM/AR III/ASO/E-NIT/24-25/827 |
| Tender Fee | 0 |
| EMD | 51900 |
| Tender Value | - |
| Place | Govindpur Area Office |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=338859 |
| Start Date | January 25, 2025 22:30 |
| End Date |
Expired
03/02/2025
Expired 619 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hay grass (loose and bundle),hay grass (loose and bundle)
Hay grass (loose and bundle),hay grass (loose and bundle)
Read moreHay grass (loose and bundle),hay grass (loose and bundle)
Hay grass (loose and bundle),hay grass (loose and bundle)
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreRemoval of legacy waste dumped in prakash nagar yard through bio- mining process
Removal of legacy waste dumped in prakash nagar yard through bio- mining process
Read moreof your Industry type