Tender Details
About Tender
๐๏ธ Invitation For Bids: Approach Road & Well Plinth Development For Oil India Limited ๐๏ธ Oil India Limited, A Leading Public Sector Undertaking, Is Seeking Bids From Experienced Contractors For The Development Of An Approach Road And Well Plinth Construction In The Demow Thowra Kachamari Moran Area. ๐ ๐ Bid Submission Deadline: June 27, 2024, 11:00 Am ๐ฒ Earnest Money Deposit (Emd): Inr 12,80,000 The Project Scope Includes The Construction Of Cc (Concrete Concrete) Or Rcc (Reinforced Cement Concrete) Foundations To Accommodate A Vfd 2 E 2000 Drilling Rig Outfit At The Specified Location. The Contractor Is Responsible For Supplying All Materials Required For The Project Except Cement. Interested Bidders Should Submit Detailed Proposals, Including Method Statements, Timelines, And Cost Estimates, Adhering To The Specifications Outlined In The Tender Documents. Keywords: Oil India Limited, Construction, Approach Road, Well Plinth, Drilling Rig, Public Sector Undertaking, Tender, Bid Submission, EmdParticulars | Details |
---|---|
Title |
Development Of Approach Road Construction Of Well Plinth Road Over Plinth Construction Of Cc Or Rcc Foundations To Suit Vfd 2 E 2000 Rig Outfit At Any Other Drilling Location At Demow Thowra Kachamari Moran Area Including Supply Of All Materials By The Contractor Except Cement
|
Description |
Development Of Approach Road Construction Of Well Plinth Road Over Plinth Construction Of Cc Or Rcc Foundations To Suit Vfd 2 E 2000 Rig Outfit At Any Other Drilling Location At Demow Thowra Kachamari Moran Area Including Supply Of All Materials By The Contractor Except Cement
|
Organisation | Oil India Limited | Public Sector Undertakings |
Tender Id | T1607283 |
Reference Number |
CDC6585P25 |
Tender Fee | 0 |
EMD | 1.28 Lakh |
Tender Value | |
Place | Demow Thowra Kachamari Moran area |
Link | https://www.oil-india.com/pdf/tenders/national/NIT_CDC6585P25.pdf |
Start Date | June 05, 2024 12:30 |
End Date |
27/06/2024 ( Expired 332 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of approach road, plinth, road over plinth, eff pit, flare pit, cc or rcc foundation as per 1000 1400 ac scr rig including supply of all materials and equipment for drilling location omga, mongaldoi, assam under the block as onhp 2021 3.
Construction of approach road, plinth, road over plinth, eff pit, flare pit, cc or rcc foundation as per 1000 1400 ac scr rig including supply of all materials and equipment for drilling location omga, mongaldoi, assam under the block as onhp 2021 3.
Read moreConstruction of g plus 1 conference cum training centre including electriacl and tele communication work at ctf moran,charaideo district. all materials to be supplied by contractor except cement.
Construction of g plus 1 conference cum training centre including electriacl and tele communication work at ctf moran,charaideo district. all materials to be supplied by contractor except cement.
Read moreConstruction of approach road, plinth, effluent pit, cc or rcc foundation as per 1400 ch 9 rig including supply of all materials and equipment for location kneb at jakuipa village, diphu,karbi anglong, assam under the block aa onn 2010 2.
Construction of approach road, plinth, effluent pit, cc or rcc foundation as per 1400 ch 9 rig including supply of all materials and equipment for location kneb at jakuipa village, diphu,karbi anglong, assam under the block aa onn 2010 2.
Read moreConstruction of approach road, plinth and foundation to suit e 1400 rig outfit on cluster basis for any location in tengakgat and chabua or any area under central field west in dibrugarh district, including supply of all materials except cement.
Construction of approach road, plinth and foundation to suit e 1400 rig outfit on cluster basis for any location in tengakgat and chabua or any area under central field west in dibrugarh district, including supply of all materials except cement.
Read moreRevamping of 1520.00 m long exisitng approach road ,construction of plinth, construction of dwarf boundary wall, plinth, rcc foundations to suit ch 10 outfit for any other location under naharkatia, mohamri and balimara area including supply of all materials except cement.
Revamping of 1520.00 m long exisitng approach road ,construction of plinth, construction of dwarf boundary wall, plinth, rcc foundations to suit ch 10 outfit for any other location under naharkatia, mohamri and balimara area including supply of all materials except cement.
Read moreConstruction or modification of approach road, plinth and foundation to suit vfd e 2000 rig outfit on cluster basis in any existing location in dikom and kathaloni area or any area under central field west in dibrugarh district ,including supply all material except cement and bitumen drum sheets
Construction or modification of approach road, plinth and foundation to suit vfd e 2000 rig outfit on cluster basis in any existing location in dikom and kathaloni area or any area under central field west in dibrugarh district ,including supply all material except cement and bitumen drum sheets
Read moreConstruction of approach road, plinth , road over plinth,effluent pit, c.c. or r.c.c. foundations to suit s 1 e 1400 rig, for any location at makum and hapjan area including supply of all plant, equipments and materials except cement
Construction of approach road, plinth , road over plinth,effluent pit, c.c. or r.c.c. foundations to suit s 1 e 1400 rig, for any location at makum and hapjan area including supply of all plant, equipments and materials except cement
Read moreImprovement and widening of approach road to hapjan ocs from rcc bridge over tingrai river to tingrai reserve near forest tiniali indirect heater with earth filling for side berm, laying culvert with head wall, gsb, wbm and sdbc work including supply of all plant and materials except cement
Improvement and widening of approach road to hapjan ocs from rcc bridge over tingrai river to tingrai reserve near forest tiniali indirect heater with earth filling for side berm, laying culvert with head wall, gsb, wbm and sdbc work including supply of all plant and materials except cement
Read moreConstruction of rcc foundation to suit ch 20 outfit, construction of plinth and dwarf wall, repairing of approach road l 100m, b 3.66m,for any location at arunachal pradesh including supply of all materials by the contractor except cement
Construction of rcc foundation to suit ch 20 outfit, construction of plinth and dwarf wall, repairing of approach road l 100m, b 3.66m,for any location at arunachal pradesh including supply of all materials by the contractor except cement
Read moreConstruction of rcc foundation to suit ch 20 outfit, construction of plinth and dwarf wall, repairing of approach road l 300m, b 3.66m,for any location at arunachal pradesh including supply of all materials by the contractor except cement
Construction of rcc foundation to suit ch 20 outfit, construction of plinth and dwarf wall, repairing of approach road l 300m, b 3.66m,for any location at arunachal pradesh including supply of all materials by the contractor except cement
Read moreof your Industry type