Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Metallurgical Investigation Of Failed Compomponents Of Power Gas Turbine Assembly
|
| Description |
Metallurgical Investigation Of Failed Compomponents Of Power Gas Turbine Assembly
|
| Organisation | IHQ of MOD (Navy) | Central Govt. Ministry/Department |
| Tender Id | 2024_NAVY_640599_1 |
|
Reference Number |
300/MGTMRC/110(Q)/M15 GT |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | INS EKSILA |
| Link |
View Original Tender Notice
https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=717118 |
| Start Date | February 03, 2024 21:30 |
| End Date |
Expired
20/02/2024
Expired 972 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Data analytics service (version 2) - metallurgical analysis of failed boiler tubes: buyer premise (on shore) service for rca of failed boiler tubes assisted bi
Data analytics service (version 2) - metallurgical analysis of failed boiler tubes: buyer premise (on shore) service for rca of failed boiler tubes assisted bi
Read moreE2563042 fabrication of turbine housing assembly
E2563042 fabrication of turbine housing assembly
Read moreSpares for hpt assembly fixtures 210 mw kwu turbine
Spares for hpt assembly fixtures 210 mw kwu turbine
Read moreCustom bid for services - removal of the worn-out/failed undercarriage assembly and fitment of a new undercarriage assembly
Custom bid for services - removal of the worn-out/failed undercarriage assembly and fitment of a new undercarriage assembly
Read moreAssembly of gas turbine rotor with the supply of consumables make
Assembly of gas turbine rotor with the supply of consumables makesiemens model v94.2 at ntpc dadri
Read moreProcurement of turbine shaft sealing assembly for nimoo bazgo power station.
Procurement of turbine shaft sealing assembly for nimoo bazgo power station.
Read moreProcurement of complete hp turbine module and ip turbine module assembly of make bhel for 250 mw kwu turbine set of unit no. 10 and 11, ph-iv, stps, sarni.
Procurement of complete hp turbine module and ip turbine module assembly of make bhel for 250 mw kwu turbine set of unit no. 10 and 11, ph-iv, stps, sarni.
Read moreTurbine flow meter,turbine flow meter,turbine flow meter
Turbine flow meter,turbine flow meter,turbine flow meter
Read moreMain steam turbine control fluid system spares for accumulator bladder assembly model: s-35-b-m50-c,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,drive turbine governing oil system spares for accumulator bladder assembly model: s-35-b-m50-c-v cap
Main steam turbine control fluid system spares for accumulator bladder assembly model: s-35-b-m50-c,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,drive turbine governing oil system spares for accumulator bladder assembly model: s-35-b-m50-c-v cap
Read moreof your Industry type