Tender Details

Particulars Details
Title
Construction Of Pipe Distribution Network For Creation Of Irrigation Potential 948.34 Ha. By Providing Irrigation Facilities To 640.77 Ha. Cca Of Wadad Minor No 1, Wadad Minor No 2, Wadad Minor No 3, And Mahalgaon Tail Minor On Left Bank Canal Of Low
Description
Construction Of Pipe Distribution Network For Creation Of Irrigation Potential 948.34 Ha. By Providing Irrigation Facilities To 640.77 Ha. Cca Of Wadad Minor No 1, Wadad Minor No 2, Wadad Minor No 3, And Mahalgaon Tail Minor On Left Bank Canal Of Low
Organisation CE Water Resources Department Gosikurda Project Nagpur | State Govt. and UT
Tender Id 2025_CEWRD_1155159_1
Reference
Number
MPDG 10/2024-25
Tender Fee 6400
EMD 4.02 Lakh
Tender Value
Place Sakoli
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2023962
Start Date March 24, 2025 20:30
End Date

04/04/2025 ( Expired 84 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Annual repairs and maintenance of sewer line network (for 2 years) by mechanical means in sector - r3, r4, r5 at r and r pocket no.1, sector - r1, r2 at r and r pocket no.2 and sector - 1 at r and r pocket no.3 of pushpak node, navi mumbai.

Annual repairs and maintenance of sewer line network (for 2 years) by mechanical means in sector - r3, r4, r5 at r,r pocket no.1, sector - r1,r2 at r and r pocket no.2&amp#x0d and sector - 1 at r and r pocket no.3 of pushpak node, navi&amp#x0d mumbai.

Read more
Construction execution of micro irrigation scheme for sonegaon stage i rd 20580 m on wadala branch of mokhabardi lift irrigation scheme for irrigation of 1718 ha. culturable command area (cca) with pipe distribution network and micro irrigation syste

Construction execution of micro irrigation scheme for sonegaon stage i rd 20580 m on wadala branch of mokhabardi lift irrigation scheme for irrigation of 1718 ha. culturable command area (cca) with pipe distribution network and micro irrigation syste

Read more
Appointment of third-party inspection agency (tpia) for construction of distribution system for 7171.77 ha. of cca including command area development (cad) of salandi left main canal from rd 40.927 km to 45.570 km through under ground pipe line irrig

Appointment of third-party inspection agency&amp#x0d (tpia) for&amp#x0d construction of distribution system for 7171.77 ha. of cca including command area development (cad) of salandi left main canal from rd 40.927 km to 45.570 km through ugpl

Read more
Supply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata

Supply and application of insulation materials on pipe, equipment for part a and part b as per standard specification by providing all required materials in connection with the composite work for setting upof hpg-2, butene-1 and psa units atlepetkata

Read more
Construction of distribution system for 3499.70 ha. of cca including command area development (cad) of salandi left main canal from rd 30.547 km to 40.927 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project

Construction of distribution system for 3499.70 ha. of cca including command area development (cad) of salandi left main canal from rd 30.547 km to 40.927 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project

Read more
Operation and maintenance of alirajpur lift irrigation scheme for 03 years including its pressurized pipe distribution network for irrigation in 35000 hectares cca on turnkey contract as per detailed scope of work (but not limited of that).

Operation and maintenance of alirajpur lift irrigation scheme for 03 years including its pressurized pipe distribution network for irrigation in 35000 hectares cca on turnkey contract as per detailed scope of work (but not limited of that).

Read more
Construction of distribution system for 5765.34 ha. of cca including command area development(cad) of salandi left main canal from rd 71.505 km to 73.003 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project

Construction of distribution system for 5765.34 ha. of cca including command area development(cad) of salandi left main canal from rd 71.505 km to 73.003 km through under ground pipe line irrigation system (gravity flow) of abp

Read more
Internal improvement works of section no. s-410 (package-09) for water supply scheme 1. khui khera rukanpura 2. kandhwala amarkot 3.saidan wali , block abohar/khuian sarwar, distt. fazilka (under nabard xxvii/jjm)

3 no. repair of old ohsr (100, 150 and 200 cum ) , 2 no. construction of new pump chamber 6.10m x 4.88m, 1 no. repair of old pump chamber 6.10m x 4.88m , distribution system, providing and fixing of new household connection, repair of existing househ

Read more
Internal improvement works of section no. s-413 (package-15) for water supply scheme 1. roop nagar 2. bareka 3. daulatpura 4. khippan wali , block khuian sarwar, distt. fazilka (under nabard xxvii/jjm)

5 no. repair of old ohsr (45, 50 and 100 cum ) , 2 no. repair of old pump chamber 6.10m x 4.88m , distribution system, providing and fixing of new household connection and repair of existing household connection complete in all respect and all other

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise