Tender Details
Particulars | Details |
---|---|
Title |
Conducting Underground Survey By Ground Penetrating Radar Over The Area From 132 By 33 K V Optcl Chhend Gss Rourkela To Nit Campus 33 K V Main Receiving Substation
|
Description |
Conducting Underground Survey By Gpr Over The Area From 132 33 K V Optcl Chhend Gss Rourkela To Nit Campus 33 K V Main Receiving Substation Along The Outer Ringroad Via Dps Chowk Ambagan Chowk Rourkela Club Chowk To Indo German Club Chowk And Nitr
|
Organisation | Central Public Procurement Portal 1 |
Tender Id | 2023_NITRK_776971_1 |
Reference Number |
NITR/EM/2023/M/0750 |
Tender Fee | 1000 |
EMD | 33400 |
Tender Value | |
Place | ESTATE MANAGEMENT NIT ROURKELA |
Link | https://eprocure.gov.in |
Start Date | October 18, 2023 18:30 |
End Date |
09/11/2023 ( Expired 564 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Transportation of one no. 132/33 kv, 50 mva imp make power transformer from 220/132/33 kv grid substation, govindpur to 132/33 kv gss manoharpur
Transportation of one no. 132/33 kv, 50 mva imp make power transformer from 220/132/33 kv grid substation, govindpur to 132/33 kv gss manoharpur and its erection, testing and commissioning at existing plinth of gss manoharpur as well as dismantling.
Read moreDesign, engineering, manufacture, survey, supply, transportation, erection, testing and commissioning for evacuation of power at 33kv level from 132 bye 33 kv grid station soti, changa to 33 bye11kv receiving station thathri in district doda
Design, engineering, manufacture, survey, supply, transportation, erection, testing and commissioning for evacuation of power at 33kv level from 132 bye 33 kv grid station soti, changa to 33 bye11kv receiving station thathri in district doda
Read moreSurvey and assessment of feasibility for modification of existing 2 ph dc towers to 3-ph dc towers by erecting two extra cross arms as proposed by railway for construction of 132 kv 3-ph dc transmission line from gss kendposi to new tss at kendposi
Survey and assessment of feasibility for modification of existing 2 ph dc towers to 3-ph dc towers by erecting two extra cross arms as proposed by railway for construction of 132 kv 3-ph dc transmission line from gss kendposi to new tss at kendposi
Read moreGrass cutting and cleaning of gss campus, office, ib and control room of 132/33 kv gss, dhalbhumgarh for the f.y. 2025-26 (i.e. from 01.04.2025 to 31.03.2026)
Grass cutting and cleaning of gss campus, office, ib and control room of 132/33 kv gss, dhalbhumgarh for the f.y. 2025-26 (i.e. from 01.04.2025 to 31.03.2026)
Read moreGrass cutting and cleaning of gss campus, gss colony, office and control room at 132/33 kv gss, chandil-ii (manikui) under transmission sub-division chandil-ii (manikui) for the period from 01.04.2025 to 31.03.2026 (365 days)
Grass cutting and cleaning of gss campus, gss colony, office and control room at 132/33 kv gss, chandil-ii (manikui) under transmission sub-division chandil-ii (manikui) for the period from 01.04.2025 to 31.03.2026 (365 days)
Read moreGrass/bush cutting and cleaning of colony area, surrounding of zone office, circle office and the residential area including temple of 132/33 kv gss, adityapur-i for the period from 01.04.2025 to 31.03.2026
Grass/bush cutting and cleaning of colony area, surrounding of zone office, circle office and the residential area including temple of 132/33 kv gss, adityapur-i for the period from 01.04.2025 to 31.03.2026
Read moreGrass cutting and cleaning of gss campus, office, ib and control room of 132/33 kv gss, baharagora for the f.y. 2025-26 (i.e. from 01.04.2025 to 31.03.2026)
Grass cutting and cleaning of gss campus, office, ib and control room of 132/33 kv gss, baharagora for the f.y. 2025-26 (i.e. from 01.04.2025 to 31.03.2026)
Read moreGrass cutting and cleaning of gss campus, office and control room of 132/33 kv gss, mango (baliguma) for the f.y. 2025-26 (i.e. from 01.04.2025 to 31.03.2026)
Grass cutting and cleaning of gss campus, office and control room of 132/33 kv gss, mango (baliguma) for the f.y. 2025-26 (i.e. from 01.04.2025 to 31.03.2026)
Read moreRail crossing of 33 kv ug line at paraj railway station
Laying of 33 kv ug cable by micro tunneling at railway crossing for drawl of 33 kv new double-circuit line from mankar 132/33/11 kv substation to proposed paraj 33/11 kv substation under burdwan north division in purba bardhaman region, west bengal
Read moreMaintaining earth continuity by erection of earth wires and earth pits with replacement of insulators for re-strengthening of the both overall 11 kv o.h. lines from kocp substation to jocp main substation at jharkhand ocp, hazaribagh area
Maintaining earth continuity by erection of earth wires and earth pits with replacement of insulators for re-strengthening of the both overall 11 kv o.h. lines from kocp substation to jocp main substation at jharkhand ocp, hazaribagh area
Read moreof your Industry type