Tender Details
Particulars | Details |
---|---|
Title |
Leak Proof Compound
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | May 21, 2025 14:08 |
End Date |
12/06/2025 ( 21 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Provn of prepaid tamper proof electronic meters and connected allied items under ge (east) ferozepur cantt
Provn of prepaid tamper proof electronic meters and connected allied items under ge (east) ferozepur cantt
Read moreAAAAAAAAAA
Login to viewConstruction of new septic tank and soak pit including reconnection of existing drainage system to it, in microwave compound yadgir (2nd call).
Read moreRoad,boundary wall and drainage work at cycle park within vidyasagar industrial park, kharagpur
Compound road with drainage system and peripheral boundary wall at cycle park (20 acres) within vidyasagar industrial park, kharagpur-i in the district of paschim medinipur
Read moreAAAAAAAAAA
Login to viewProviding new drainage line from auditorium to external manhole at back side of iq providing steel mesh frame to toilet ventilators repair works inside shaft and miscellaneous works in cgm office compound halasuru
Read moreCapital work of 33 kv substation kadapra
Construction of compound wall at 33 kv substation kadapra
Read moreCa no. ge af no.1/gur-24/2025-26 repair/replacement to dustbins, security/ compound walls, grit wash, path, rain water harvesting pit, drains, fencing, culvert etc in domestic and g-block at 54 asp under ge (af) gurgaon no.1
Ca no. ge af no.1/gur-24/2025-26 repair/replacement to dustbins, security/ compound walls, grit wash, path, rain water harvesting pit, drains, fencing, culvert etc in domestic and g-block at 54 asp under ge (af) gurgaon no.1
Read moreHeat exchanger cover opening and boxing up after hydro-jet cleaning and tube leak fixing in urea plant during tar 2025
Heat exchanger cover opening and boxing up after hydro-jet cleaning and tube leak fixing in urea plant during tar 2025
Read moreof your Industry type