Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Loading And Handeling Of Blasted Muck At 13 L North At Balaghat Mine
|
| Description |
Loading And Handeling Of Blasted Muck At 13 L North At Balaghat Mine
|
| Organisation | MOIL Limited | Central Govt. Ministry/Department |
| Tender Id | 2025_MOIL_788747_1 |
|
Reference Number |
MINING/BGT/LTE/23-24/1673 DATED 11/02/2025 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Balaghat Mine |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1093119 |
| Start Date | February 13, 2025 15:30 |
| End Date |
Expired
17/02/2025
Expired 600 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreRemoval of suppressed muck from ch. 13 to ch. 27 at 12th l (north) at balaghat mine
Removal of suppressed muck from ch. 13 to ch. 27 at 12th l (north) at balaghat mine
Read moreDrilling of production holes at 13 l north at balaghat mine
Drilling of production holes at 13 l north at balaghat mine
Read moreDrilling of production holes at 13 l north at balaghat mine
Drilling of production holes at 13 l north at balaghat mine
Read moreRemoval of suppressed muck from ch. 25 to ch 40 at 10th l north balaghat mine
Removal of suppressed muck from ch. 25 to ch 40 at 10th l north balaghat mine
Read moreRemoval of suppressed muck from ch. 40 to ch 27 at 12th l (north) balaghat mine
Removal of suppressed muck from ch. 40 to ch 27 at 12th l (north) balaghat mine
Read moreDrilling of production holes at 8l north ,9 l north balaghat mine
Drilling of production holes at 8l north ,9 l north balaghat mine
Read moreDrilling of production holes at 8l north 9 l north balaghat mine
Drilling of production holes at 8l north 9 l north balaghat mine
Read moreDigging of suppressed muck at 13.5th level north from ch 40 to ch 27 balaghat mine
Digging of suppressed muck at 13.5th level north from ch 40 to ch 27 balaghat mine
Read moreof your Industry type